Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Normal approximation to compute the probability:
A lot contains 100 articles of which 10 are defective. The lot is rejected if a random sample of 10 articles drawn from the lot contains more than 2 defectives. Use normal approximation to compute the probability that the lot is accepted.
Solution:
Let X represents the number of defective articles in the sample. The variable X follows the hypergeometric distribution with parameters
N = 100,n - 10,M = l0 and has E(X) = 10.(10/100) = 1 and
V(X) =σ2 = 10.10/100.(1-(10/100)) (100-10/100-1) =9/11
The required probability is
Explain the Basic requirement of Design of shock transmission unit? The STU must withstand the specified design load. The stroke of the piston must be bigger than the movement
Q. Show the application of Concrete crash barriers? Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexibl
BRICKS Brick is obtained by moulding good clay into a block, which is dried and then burnt. It is the oldest building block to replace stone. Manufacture of brick started havin
Explain the term - Moderate Prestressing In this form of prestressing, no limit is imposed on the magnitude of tensile stresses which may be produced in a concrete member unde
how to design asewa system ??
This is an optional team assignment. This grade will replace your lowest two homework grades. You may work in teams of 3-4 students. Design the lightest concrete cantilever beam
fabrication methods of ironmongery
Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed
State the group efficiency of a rectangular group of piles with 4 rows, 3 piles per row, the uniform pile spacing being 3 times the pile diameter. If the individual pile capacity i
The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd