Normal approximation to compute the probability, Civil Engineering

Assignment Help:

Normal approximation to compute the probability:

A lot contains 100 articles of which 10 are defective. The lot is rejected if a random sample of 10 articles drawn from the lot contains more than 2 defectives. Use normal approximation to compute the probability that the lot is accepted.

Solution:

Let X represents the number of defective articles in the sample. The variable X follows the hypergeometric distribution with parameters

N = 100,n - 10,M = l0 and has E(X) = 10.(10/100) = 1 and

V(X) =σ2 = 10.10/100.(1-(10/100)) (100-10/100-1) =9/11

The required probability is

903_Normal approximation to compute the probability.png


Related Discussions:- Normal approximation to compute the probability

Surveying, Explain about reciprocal ranging

Explain about reciprocal ranging

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Determine the stage of cracking moment of pre-stress, Determine the stage o...

Determine the stage of Cracking moment of pre-stress  At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight

Influence Line for shear at Support, I have to draw the IL for the shear at...

I have to draw the IL for the shear at a roller support and am not sure how it should look

State the term - stresses from concrete to reinforcement, State the term - ...

State the term - Stresses from concrete to reinforcement Stresses from concrete to reinforcement, or vice-versa, in reinforced concrete are transferred due to bond between conc

Angular messurement using total stations, write a short note on angular mes...

write a short note on angular messurement using stations?

Define lead lag relationships - construction management, Define Lead Lag Re...

Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd