Net present value method: npv, finance, Other Engineering

Assignment Help:
Discounted cash flow methods
Net present value method: NPV
It is one of the classic methods of evaluating the investment project. Here each potential projects value is find out its net present value (NPV). This method considers the time value of money and should that cash flow arising at different time differ in value, hence need to find out its present value (Robert Parrino & David s. Kidwell, 2009).
Steps involved in the calculation NPV:
• Find out the cash inflow from a project based on realistic assumption.
• Determine the appropriate discounted rate.
• Calculate the present value of cash inflow based on discounted rate.
• Net present value is calculated by deducting present value of cash outflow from the present inflow (I.M. Pandey, 2005).
Accept Reject rule:
Accept the project if NPV is positive NPV>0
Reject the project if NPV is negative NPV<0 (Robert Parrino & David s. Kidwell, 2009).
Merits of NPV:
• The value of money is considered.
• NPV considers cash flow occurring in the life of the project to calculate its worth.
• This method considers discounting rate to calculate present value of cash flow.
• This method considers the objective of maximizing shareholders wealth (I.M. Pandey, 2005).
Demerits to NPV:
• Difficult to forecast future cash flow as future is uncertain.
• If right discount rate is not considered then it leads to wrong investment decisions.
• It is not suitable when alternative projects with unequal lives exist (I.M. Pandey, 2005).

Related Discussions:- Net present value method: npv, finance

Propeller balance, PROPELLER BALANCE There are two types of balance of ...

PROPELLER BALANCE There are two types of balance of importance when working with propellers: • Static Balance • Dynamic Balance Static balance is checked and corrected

Wire drawing, Wire Drawing involves pulling the metal through a die by mea...

Wire Drawing involves pulling the metal through a die by means of tensile force applied to the exit side of the die.          A typical wire drawing operation is shown in fig.

Heisenberg''s uncertainty principle , According to this it is impossible to...

According to this it is impossible to specify precisely and simultaneously two physical quantities those are canonically conjugate to each other and the product of the uncertainty

Starting worki in ccs.., 1- plot and creat x1(t)=4exp(t/5),x2(t)=Sin(2pift+...

1- plot and creat x1(t)=4exp(t/5),x2(t)=Sin(2pift+Pi/2) 2-write a c fucntion to compute convolution of n2 finite series ands plot 3-implemet an FIR filter in c in CCS

Parmpreet, Hi, i want to get a quote for my communication networks assignme...

Hi, i want to get a quote for my communication networks assignment

ALGORITHM, write an algorithm to find a number that multiplies your name 10...

write an algorithm to find a number that multiplies your name 10 times

#title.electronic devices., Advantages and dis advantages of a diode in ser...

Advantages and dis advantages of a diode in series /shunt

Fire alarm systems - look for when inspecting, Fire alarm systems: Fir...

Fire alarm systems: Fire alarm systems can be very complex and it is usually not possible for an enforcing officer to check all the cabling, the components, the software and t

Digital electronic.., design a 32:1 multiplexer using 16:1 multiplexer

design a 32:1 multiplexer using 16:1 multiplexer

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd