Necessity of pile tip cover for rock-socketed H-piles, Civil Engineering

Assignment Help:

Q. Necessity of pile tip cover for rock-socketed H-piles?

In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The objective of such arrangement is to avoid the potential occurrence of corrosion to H-piles just in case concrete cover isn't designed at pile tips. Though recent field andlaboratory observations had reservation of this viewpoint. In case H-piles are designed to be placed directly on top of rock surface, it provides tip resistance to limit the pile movement in the event of bond rupture between H-piles and grout. Some contractors can choose to tamp the H-piles by employing drop hammers to make sure the H-piles are founded directly on top of rock surface. Practically speaking, it poses difficulties at the time of process of tamping since there is a chance of possible buckling of long H-piles when too much energy is provided to piles.


Related Discussions:- Necessity of pile tip cover for rock-socketed H-piles

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Particle size distribution - soil compaction, Particle Size Distribution (G...

Particle Size Distribution (Gradation): The particle size distribution is determined by passing the aggregates through a set of standard IS sieves (Figure) and determining th

Cost estimating, I would like to know if anyone can help me with my const e...

I would like to know if anyone can help me with my const estimating project

Marine piles circular in cross section, Question Give reason that why a...

Question Give reason that why are most marine piles circular in cross section? Answer As marine piles, there are a number of options existing for selection, name as H-

How to find back bearings?, Example: The following fore bearings were ...

Example: The following fore bearings were observed respectively for lines, AB, BC, CD, DE, EF and FG. Find out their back bearings: (i) 148°                          (ii

Define the rectangular weirs, Define the Rectangular Weirs Sometimes re...

Define the Rectangular Weirs Sometimes referred to as "sharp crested weirs" if the top edge of the weir plate is narrow

Determine the flow velocity, Determine the flow velocity in 2,000 ft of 8 i...

Determine the flow velocity in 2,000 ft of 8 inch diameter piping flowing full. The energy lost in piping is 54 ft. Use nominal pipe diameter and C = 140.     Solution: Use v =

What is objective method of assessment, Q. What is objective method of asse...

Q. What is objective method of assessment? Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A conti

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd