Multiple  Objectives

The sample  may vary according  to the  objective of the research. There  may several objectives  of marketing  research so the  sample  size  may vary as per distinctive objectives. Apart from  these objectives  statistical variable  are also  taken  into  consideration viz,  confidence level  desired  standard  deviation and  so on. These may also  affect  the samples  size.

 


Related Discussions:- Multiple objectives- sampling decisions

Transpotation problem, a manufacture wants to ship 8 loads of his product a...

a manufacture wants to ship 8 loads of his product as shown below. The matrix gives the mileage from origin to the destination D. Origin Destination Available A B C X 50 30 220

Big M mehod, source code in c available?

source code in c available?

Nass food produce tow kinds of popular dark chocolate bars, Nass food prod...

Nass food produce tow kinds of popular dark chocolate bars

Duality, For every LP formulation there exists another unique linear ...

For every LP formulation there exists another unique linear programming formulation called the 'Dual' (the original formulation is called the 'Primal'). Same data

Carry out resource levelling for equipment resource, Teesside Construction ...

Teesside Construction is developing a schedule for a major building project to start in 04/01/2011 in Middlesbrough, UK. The project manager has identified major activities of the

Operations function - information system, The Operations Function has alway...

The Operations Function has always relied heavily on information for its smooth running. During this course information has been introduced as one of the five inputs to the convers

Paired sample sign test - hypothesis testing , Paired sample  sign Test ...

Paired sample  sign Test Paired samples  sign test is applied  to a situation where two sample  are taken from  two population which  have continuous symmetrical distributi

Assignment 2012, Problem 1 (Problem 23, page 507) At a machine tool plant, ...

Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job. If a mac

Vogel approximation methods, This method is more  systematic and orderly th...

This method is more  systematic and orderly than least cost method. Here penalties for each column and row of the transportation table are determined, and the row  or  column with

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd