Monitoring state of reclamation, Civil Engineering

Assignment Help:

Question

Geotechnical Instrumentation is often employed for monitoring state of reclamation. From time to time two piezometers are installed inside same borehole. What is main motive after this?


Answer

For standpipes, they usually contain one plastic tube between its intention is to test water level only. Though, for piezometers, they are used for measuring pore water pressure in certain intensity below ground. For case, if there are two clayey layers below ground at unlike depths, many piezometer including two part piezometers might be sunk at same borehole to determine pore water pressure at these layers respectively. This pact has pro that it saves cost of installation of separate boreholes for quite a few piezometers. Still, installation of multiple piezometers within same borehole is affected by incidence of leak the length of pipes

 


Related Discussions:- Monitoring state of reclamation

Define rotation - actions in pot bearings, Define Rotation - Actions in POT...

Define Rotation - Actions in POT Bearings? POT bearings are associated with large rotations which are accommodated by the deformation of elastomeric pad. Large cyclic rotations

Explain use of scour valve, Q. Explain Use of Scour Valve? Scour Valve ...

Q. Explain Use of Scour Valve? Scour Valve - Scour Valve at depressions on the main for clearing and emptying the pipes. It is also called blow off valve or Drain valve. This t

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

Define the pre-tensioned concrete construction, Define the pre-tensioned co...

Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Construction of parabolic shapes, construct parabolic shapes using the enve...

construct parabolic shapes using the envelop method and the offset method with dimensions 80 by 120

State the loss of prestress, State the Loss of prestress Loss of prestr...

State the Loss of prestress Loss of prestress due to elastic shortening definitely occurs in pre-tensioned concrete members. But in post-tensioned members it does not occur if

Load carrying element of min-piles, Q. A pipe or groups of bars be adopted ...

Q. A pipe or groups of bars be adopted as load carrying element of min-piles? The design of mini-piles someway differs from other traditional pile types. For example the design

Explain flow measurement with weirs, Explain Flow Measurement with Weirs ...

Explain Flow Measurement with Weirs Fixed plates positioned vertically in an open channel over which flow is directed through an opening. The opening linear distance is termed

Soil compaction, Soil Compaction: Soils used in road construction nee...

Soil Compaction: Soils used in road construction need to be thoroughly rolled and compacted. Compaction of soil is needed for the following reasons. (a) A well compacted s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd