Geotechnical Instrumentation is often employed for monitoring state of reclamation. From time to time two piezometers are installed inside same borehole. What is main motive after this?
Answer For standpipes, they usually contain one plastic tube between its intention is to test water level only. Though, for piezometers, they are used for measuring pore water pressure in certain intensity below ground. For case, if there are two clayey layers below ground at unlike depths, many piezometer including two part piezometers might be sunk at same borehole to determine pore water pressure at these layers respectively. This pact has pro that it saves cost of installation of separate boreholes for quite a few piezometers. Still, installation of multiple piezometers within same borehole is affected by incidence of leak the length of pipes
hoyers long line method?
Define Fathometer with the odolite - Sounding/Sensing Devices? The horizontal scale problem in use of Fathometer can be solved by using equipment, which combines a Fathometer w
Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w
what are the roles of civil engineers in storm water management
what is the importance of plagiarism in civil Engeneering
Two load tests were conducted at a site-one with a 0.5 m square test plate and the other with a 1.0 m square test plate. For a settlement of 25 mm, the loads were found to be 60 kN
Q. Afflux on account of obstruction to flow? Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critica
construction detail of all types of flooring
Q. Which type of pile cap transfers loads equally to piles, flexible pile cap orrigid pile cap? Loads from columns transferring to pile cap persuade tensile forces at the bott
write a program to design two way slab
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd