Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

Use single lock nuts or double lock nuts, Question In linking fenders t...

Question In linking fenders to pier organizations, would single lock nuts or double lock nuts be used? Answer In pier structures connection offenders to piers is a

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Counter map, how will you determine the intrtvisibility of a point if the c...

how will you determine the intrtvisibility of a point if the counter map is given to you? explain by giving an exampe

Immersed tube method for underwater crossings, Immersed tube method for und...

Immersed tube method for underwater crossing includes the following basic construction steps: (i)  Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Unreinforced concrete pavement function without mesh, Question How can ...

Question How can it would be able for unreinforced concrete pavement function without mesh reinforcement ? Answer Concrete carriageway, it is usually classified into t

Mechanics of solids, if we take brass & steel and on applying temperature t...

if we take brass & steel and on applying temperature the brass contracts the steel expands how it is possible

Show the application of concrete crash barriers, Q. Show the application of...

Q. Show the application of Concrete crash barriers? Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexibl

Cost of utilities and taxes, The cost of utilities, taxes and maintenance o...

The cost of utilities, taxes and maintenance on a home is $3,000 per year.  The amount of money that would have to be invested now at 8% to cover these expenses for the next 5 year

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd