Moisture-density relationship, Civil Engineering

Assignment Help:

Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

Calculate the uniform pressure on the soil, The plan of a proposed spoil he...

The plan of a proposed spoil heap is shown in Fig. The heap will stand on a thick deposit of soft clay with E-value 15 MN/m 2 . The uniform pressure on the soil may be suppose as 1

Road construction, how to calculate various quantities of materials for wet...

how to calculate various quantities of materials for wet mix macadam and dense bitumen macadam

Environmental engineering, A nearly horizontal, 12 ft wide rectangular chan...

A nearly horizontal, 12 ft wide rectangular channel carries 60 cfs at a depth of 3.0 ft. The width of the channel is smoothly contracted to 6 ft at the downstream section. (a) Dete

Lead products in construction, What are the advantages and disadvantages of...

What are the advantages and disadvantages of lead products in construction? Ans) Disadvantages: -Lead is very toxic; its use can result in pollution of the ground and more signi

Define equipments for inspection of steel/cast iron, Define Equipments and ...

Define Equipments and tools for Inspection of Steel/Cast Iron Substructures? To ensure thorough inspection, the area must be cleared of all marine growth. Hand tools such as wi

Plane tabling, difference between compass suveying and chain surveying

difference between compass suveying and chain surveying

Survey, who to we calculate the RL at first point.

who to we calculate the RL at first point.

Measurement of surface runoff and infiltration, Surface runoff travelling o...

Surface runoff travelling over ground surface to reach receiving water involves the following events: i) Rainfall intensity exceeds soil's infiltration rate; ii) Excess water

Maintenance of water bound macadam roads, Maintenance of Water Bound Macada...

Maintenance of Water Bound Macadam Roads: The maintenance of water bound macadam surface consists of : filling potholes, ruts with additional material and adequately c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd