Moisture-density relationship, Civil Engineering

Assignment Help:

Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

What is the group capacity, State the group efficiency of a rectangular gro...

State the group efficiency of a rectangular group of piles with 4 rows, 3 piles per row, the uniform pile spacing being 3 times the pile diameter. If the individual pile capacity i

State the ultimate load capacity of the pile group, A group of 16 piles of ...

A group of 16 piles of 50 cm diameter is arranged with a centre to centre spacing of 1.0 m. The piles are 9 m long and are embedded in soft clay with cohesion 30 kN/m 2 . Bearing r

Design of prestressed concrete pipes, Design of prestressed concrete pipes ...

Design of prestressed concrete pipes The design of prestressed concrete pipes should cover the following five stages : (a) Circumferential prestressing, winding with or wit

Calculate the modulus of elasticity of concrete, Calculate the Modulus of e...

Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend

Surveying, what is compass survey and and its method

what is compass survey and and its method

Design nominal reinforcement to piles, Question Is it true that there i...

Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce

Constraction, sir what is means by share force

sir what is means by share force

Analytical methods for pollutants under the clean water act, Analytical Met...

Analytical Methods for Pollutants Regulated Under the Clean Water Act? We suppose that you have knowledge of and access to the relevant analytical methods. These methods cover

Timber, charring of timber

charring of timber

What is the absolute pressure scale, Absolute pressure is measured from a v...

Absolute pressure is measured from a vacuum (0 PSI) and atmospheric pressure is14.7PSIa or 14.7 PSI above a vacuum 1PSI on a tire pressure gauge is known as 1PSIg = 15.7PSIa 10PSIg

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd