Moisture-Density Relationship:
Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.
For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.
working from whole to part
haw to control quality of constraction material and it''s stage of control, control management, quality of performance ,organization for control
A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo
Determine load carried by each cylinder: A hollow steel cylinder of cross-sectional area 2000 mm 2 concentrically surrounds a solid aluminium cylinder of cross-sectional area
Intercepting Drains: Intercepting drains, also known as catch-water drains, are provided in the uphill slope of hill roads to intercept the water and lead it to a natural wat
Define Permissible Bearing Pressure on poly tetra fluoro ethylene? For the purpose of design, it is important to lay down permissible bearing pressure on PTFE sliding surfaces.
Q. Butt weld – from one side vs from both sides? In the design of butt weld strength, it's normally presumed that its strength is at least equivalent to parent metal. To improv
Prime Coat: A prime coat is the application of a low viscosity binder, usually a bituminous emulsion, to a gravel, WBM or WMM surface, to enable the binder to fill up the voi
What is the economic span of a bridge
Q. What do you mean by River Gauging? Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river chan
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd