Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Geology class, I want to get answer of each questions that I Have in a sep...

I want to get answer of each questions that I Have in a separate paragraphs, and the information should be from sources so please fro each question that you answer write after it t

Plumbing, what is the different kinds of pipes and fittings

what is the different kinds of pipes and fittings

Estimating, a 45 cm deep roof beam is provided on 30 cm wall of a room size...

a 45 cm deep roof beam is provided on 30 cm wall of a room size 3.0m*5.0m . calculate the quantity of steel required in beam on percentage basis.

Designing of pipe jacking, Question While designing of pipe jacking , ...

Question While designing of pipe jacking , what particular areas on pipe joints have to engineers make sure of? Answer While in pipe jacking, jacked pipes may well ha

Vertical gradient - geometric design of roads, Vertical Gradient: Ver...

Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit

Batching of concrete, Introdaction , volume batching , weighat batchin...

Introdaction , volume batching , weighat batching , mesaring of water

Define the crash rate for intersection, An intersection has a total enterin...

An intersection has a total entering traffic volume of 42,000 vehicles per day.  During the past three years, there have been a total of 35 reported intersection-related crashes.

Components of a typical expansion joint, Question Explain components of a t...

Question Explain components of a typical expansion joint? Answer Dowel bar-This is major component of joint. It serves to guide direction of movement of concrete growth. Therefo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd