Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

Explain census of traffic at level crossings, Q. Explain Census of Traffic ...

Q. Explain Census of Traffic at Level Crossings? Periodical census of traffic at all level crossings, unmanned/manned should be taken at least once in five years to review the

What do you mean by guide bunds, Q. What do you mean by Guide bunds? Gu...

Q. What do you mean by Guide bunds? Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel

The regulations and specification that followed for compacti, what are The ...

what are The regulations and specification that followed for compaction works for earth dam in Oman.

Water bound macadam, Water Bound Macadam: Water Bound Macadam (WBM) i...

Water Bound Macadam: Water Bound Macadam (WBM) is a dense and compact course of a road pavement composed of stone aggregates held together by a film consisting of gravel or s

Key functions of changed components of paint, Question What are key fun...

Question What are key functions of changed components of paint? Answer For regular paint application, there are largely three key components of paint, namely primer, u

Explain the critical depth, Explain the Critical Depth d c is the dept...

Explain the Critical Depth d c is the depth of flow in an open channel that has the lowest energy.  In rectangular open channels:  (d c ) 3 = Q 2 /g(w) 2 In nonrectang

Explain about the hydrogen embrittlement, Explain about the Hydrogen Embrit...

Explain about the Hydrogen Embrittlement As a result of the action of acids on high-tensile steels, liberation of hydrogen takes place. It penetrates into the steel surface an

Shear force, Shear distribution for I section

Shear distribution for I section

Centroid, use of centroid in civil engineering

use of centroid in civil engineering

Brick pavement, Brick Pavement: In regions where stone aggregates are...

Brick Pavement: In regions where stone aggregates are not available within economical leads, bricks provide a cheaper alternative. Flat-brick or brick-on-edge pavements provi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd