Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

Define underwater magnetic particle testing, Define Underwater Magnetic Par...

Define Underwater Magnetic Particle Testing? Underwater magnetic particle testing (UWMT) is a non-destructive testing suited for detection of surface cracks or discontinuities

Define resultant force on a given area of a horizontal plane, Resultant For...

Resultant Force on a Given Area of a Horizontal Plane By equation, the total vertical force applied to an area A on the plane is: Resultant Force R = ΡA = (lb/ft 2 )(ft 2 )

Assessing maintenance needs, Assessing Maintenance Needs: Maintenance...

Assessing Maintenance Needs: Maintenance needs can be assessed by a careful inspection of roads at regular intervals, observing defects such as : potholes cracks

Normal stress, how does wrong calculations in normal stress cause partial o...

how does wrong calculations in normal stress cause partial or total collapse of a building?

Define cleaning for underwater inspection of bridge, Define Cleaning for Un...

Define Cleaning for Underwater Inspection of Bridge? Before any structure can be inspected, it is necessary to expose the surface material of the structure. Wherever there is m

ceramics is what type of materials, Ceramics is what type of materials ? ...

Ceramics is what type of materials ? Answer: It is  an insulators.

Doors and windows, important considerations in case of doors and windows

important considerations in case of doors and windows

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd