Moisture-density relationship, Civil Engineering

Assignment Help:

Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.


Related Discussions:- Moisture-density relationship

English, Features of literary writing

Features of literary writing

Strength of materials, An I-section beam 350*200mm2 has a web thickness of ...

An I-section beam 350*200mm2 has a web thickness of 12.5mm & a flange thickness of 25mm. It carries a shearing force of 200KN at a section. Sketch the shear stress distribution acr

Computation of settlement, Q. Computation of Settlement? The settlement...

Q. Computation of Settlement? The settlement  in any soil mass under an applied stress is given by s = s i + s c + s s where, S  =  total settlement, S i =  imm

Joints in concrete carriageway, Question Is it necessary joints of conc...

Question Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway ? Answer In regular practice, joints are provided in road kerbs to ca

Changeable depth bridge decks, Question What is the sucker deck principle f...

Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greater tha

FOUNDATION, TYPE OF FOUNDATION IN LATERITE SOIL

TYPE OF FOUNDATION IN LATERITE SOIL

Distomat, Feactures and uses of distomat

Feactures and uses of distomat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd