Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

What is, what is soundness of casting.

what is soundness of casting.

Show seismic loads for ground supported equipment, Q. Show Seismic Loads Fo...

Q. Show Seismic Loads For Ground Supported Equipment? V = C s W is the governing equation for horizontal seismic base shear of ground supported equipment. C s  = 1.2A v S/(RT

Determine the reactions at supported end, A steel dia 10 mm passes through ...

A steel dia 10 mm passes through a brass tube of internal dia 15mm and external dia is 25 mm. The bolt is tightened by a nut. The length of tube is reduced by 1.5mm and the length

What is the velocity of the crosshead - crank, What is the velocity of the ...

What is the velocity of the crosshead - crank: In the slider crank mechanism shown in Figure, the crank is rotating clockwise at 120 revolution/minute. What is the velocity of

Screw conveyors, Screw Conveyors: Screw conveyors are used principally f...

Screw Conveyors: Screw conveyors are used principally for transmitting materials in the form of powder or paste with the application of rotating screw. For example feedin

Define the skid fabrication, Q. Define the skid fabrication? Unless not...

Q. Define the skid fabrication? Unless noted otherwise in this specification, skid fabrication shall be in accordance with GS-904-0510, GS-904-0511 and GS-904-0515. Dimensio

project on machine design , can you help me to do my project on machine d...

can you help me to do my project on machine design,it is specific project with calculation and some draw.

Explain the 3-2-1 principle of location, Explain the 3-2-1 Principle of Loc...

Explain the 3-2-1 Principle of Location A work piece can be positively located by means of 6 pins so positioned that collectively they restrict the work piece in nine of it

Curvilinear motion of a partical, Consider a particle and its path of trave...

Consider a particle and its path of travel.The position of a particle P at any time t can be described by specifying its: (a)Rectangular coordinates; X,Y,Z (b)Cylindrical coordinat

Thermodynamics, what is the difference between point function and path func...

what is the difference between point function and path function?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd