Q. Minimum and maximum distance between bars?
Minimum distance between bars and maximum distance between bars
In some codes, a minimum distance amid bars is specified to allow for sufficient space to provide accommodation for internal vibrators at the time of compaction.
Inversely the restriction of maximum bar spacing is typically for controlling crack width. For a provided area of tension steel areas, distribution of steel reinforcement affects the pattern of crack formation. It is predominant to have smaller bars at closer spacing rather than larger bars at larger spacing to be effective in controlling cracks.
Henceforth the limitation of bar spacing beyond a definite value (means maximum distance between bars) aims at better control of crack widths.
Cargo Handling Facilities: All water transport terminals require cargo handling facilities. Cranes of various sizes are used. In docks, traveling cranes are popular (Figure).
how to remove dampness in mud houses?
Limit State of Serviceability Deflection In the consideration of this limit state, the deflection of a structural member is considered. The code recommends that the deflection
Mad/Sir What would be the Horizontal and vertical component from this acting force see diagram
What is the binding material of the water bound macadam road
HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC
What is bench mark
Q. Explain about Bentonite slurry and polymeric slurry? For the construction of diaphragm walls, bentonite slurry is generally used to form a filter cake on walls of trenches t
Tendon splices Tendon splices are used to join tendons when continuous prestressed concrete , members require long tendons to achieve continuity. Several types of tendon splic
Methods of Constructing Roads in Marshy Areas: The following methods are adopted for constructing roads in marshy areas: (a) Removal of soft soil and replacement with good
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd