Minimum and maximum area of reinforcement, Civil Engineering

Assignment Help:

Q. Minimum and maximum area of reinforcement?

Minimum area of reinforcement vs. maximum area of reinforcement

Beams can be designed to be larger than required for strengthconsideration because of aesthetics or other reasons. As such, corresponding steel ratio is very low and moment capacity of pure concrete section based on the modulus of rupture is higher than its ultimate moment of resistance. Consequently reinforcement yields first and extremely wide cracks will be formed. A smallest area of reinforcement is specified to avoid the formation of wide cracks.

Contrariwise, a maximum area of reinforcement is specified to allow the placing and compaction of fresh concrete to occur easily.


Related Discussions:- Minimum and maximum area of reinforcement

Traditional marine piling system of steel tubular pile, Question What i...

Question What is problem in traditional marine piling system of steel tubular pile with concrete infill and what are key possible remedial measures? Answer In design

Explain forty-five degree spread rule for driven piles, Q. Explain Forty-fi...

Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi

Use of stone aggregates in road construction, Use of Stone Aggregates in Ro...

Use of Stone Aggregates in Road Construction Stone aggregates are extensively used in roads in pavement layers. They are obtained from natural rock. The following geological

Determine the limit states of serviceability, Limit States of Serviceabilit...

Limit States of Serviceability These are those limit states which point out to the inability of a structure or a structural component in functioning properly as per the intende

Explain sedimentation, Explain Sedimentation 1. Sedimentation bas...

Explain Sedimentation 1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period 2. Basins are usually rectangular or

Roads, difference between BM and BC in black topping

difference between BM and BC in black topping

General about tests, 1. All testing shall be done at room temperature. 2...

1. All testing shall be done at room temperature. 2. No bearing shall be tested earlier than a week after vulcanization. 3. Bearing sections shall be cut from test bearings w

Assignment, How to do assignment on the basis of azetropic mixture

How to do assignment on the basis of azetropic mixture

Define the approach velocity, Define the Approach Velocity Typical prob...

Define the Approach Velocity Typical problems have negligible approach velocity.  v 1 = Q/A, where A = the cross-sectional area of flow in the channel. The value is not the ve

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd