Method to calculate the loss of prestress, Civil Engineering

Assignment Help:

Method to calculate the loss of prestress

When the consider creep in regard to loss of prestress, we have to see that the prestressed member is under compressive stresses due to prestresses. Due to these compressive stresses, compressive strains are produced. The immediate effect of these compressive strains is considered in the calculation of loss of prestress due to elastic shortening.


Related Discussions:- Method to calculate the loss of prestress

Soil Mechanics, What relationship between Atterberg limits and cohesion

What relationship between Atterberg limits and cohesion

Explain resultant force on a area of a vertical plane, Resultant Force on a...

Resultant Force on a Given Area of a Vertical Plane The resultant force is calculated from the average pressure: R = (AVERAGE Ρ)(A)

Offset, what is the meaning of offset

what is the meaning of offset

Open graded premix carpet, please tell me about gradation of open graded pr...

please tell me about gradation of open graded premix carpet

Energy dissipation at outlets - typical drainage outlet, Q. Energy dissipat...

Q. Energy dissipation at outlets - typical drainage outlet? Flow velocity at outlets is generally high. Without proper control of this energy, subsequent bank erosion can resu

Define installation of pot bearings, Define Installation of Pot Bearings? ...

Define Installation of Pot Bearings? In a sliding POT bearing, positive fixing to the main structure may not be required if the bearing is always subjected to adequate vertical

Present worth of an infinite series of annual amount, The construction of a...

The construction of a new bakery requires the property development firm to pay the municipality the cost to expand its sewage treatment plant. In addition to the expansion costs, t

PLANKING AND STRUTING FOR SHALLOW EXCAVATION, DEFINITION TYPE STEP OF CON...

DEFINITION TYPE STEP OF CONSTRUCTION STEP OF SAFETY

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Classification of bricks based on their quality, Classification of Bricks B...

Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd