Method of construction of a bored cast-in-situ concrete pile, Civil Engineering

Assignment Help:

Q. Method of construction of a bored cast-in-situ concrete pile?

Ans. - Bored cast-in-situ concrete pile - A guide casing of 3 to 4 m length is provided on top of the bore hole and is driven with the help of a bailer. Further boring below this casing is carried out by chiselling and the side walls are kept stable by circulating bentonite slurry inside the bore hole. The Bentonite clay used in the operation should conform to provisions made in IS : 2911 -Part -1, section -2. After reaching the founding level, the chisel is removed, the bore hole flushed and the reinforcement cage lowered into the hole and held in position by tack welding it to the support bars at the top of the casing.

After this the concreting is carried out by using a "tremie" .The concreting is continued till a good quality concrete is seen at the top of the bore hole. The concrete used is a high slump mix (not leaner than M 20 grade ). Cast-in-situ piles in which the steel shell is left in the ground ensures the quality of concrete and offers corrosion protection in soils containing chlorides and sulphates.

635_Method of construction of a bored cast-in-situ concrete pile.png


Related Discussions:- Method of construction of a bored cast-in-situ concrete pile

Dissimilarities in function b/w rock anchors and rock socket, Question ...

Question What are main dissimilarities in function between rock anchors and rock sockets ? Answer Rock anchors are used first and foremost for resisting uplift forc

Seminar class, I have a writing that needs to be corrected

I have a writing that needs to be corrected

Physical deterioration - underwater inspection of bridges, Define Physical ...

Define Physical deterioration - underwater inspection of bridges Typical defects include: -   Scaling -   Cracking -   Spalling -   Disintegration -   Abrasion

Maximum shear stress, Maximum shear stress: The state of stress at a c...

Maximum shear stress: The state of stress at a critical point of a strained solid is given by σ x = 70 kN/mm 2 , σ y = - 50 kN/mm 2 and τ xy = 45 kN/mm 2 . If the strength

Compare the probabilities, Compare the probabilities: Use the central ...

Compare the probabilities: Use the central limit theorem to compute P (¦ X - μ ¦ ≥ k), k = 1, 2,3,4,5 where X and μ are as defined in Example. Compare the probabilities with t

Explain the coefficient of permeability, A sand deposit of 12 m thick overl...

A sand deposit of 12 m thick overlies a clay layer. The water table is 3 m below the ground surface. In a field permeability pump-out test, the water is pumped out at a rate of 540

Raport, CASTE DISCRIMANIMATION

CASTE DISCRIMANIMATION

Define facilities that discharge wastewater to a potw, Facilities that disc...

Facilities that discharge wastewater to a publicly owned treatment works? Facilities that discharge wastewater to a POTW (publicly owned treatment works) are known as subject t

Bitumen tests, discussion of each bitumen test, its significance and import...

discussion of each bitumen test, its significance and importance in understanding and working with bitumen

Forensic structural engineering, i need journals or articles of forensic st...

i need journals or articles of forensic structural engineering

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd