Merits of continuous or flow production, Operation Management

Assignment Help:

Merits of Continuous or Flow Production

1.The direct labor content will be reduced since the comprehensive pre planning which is necessary will often produce economies in time.

2.Assuming the product task is initially designed correctly the reproducibility and hence the accuracy and precision are high .

3.Since inspection is inline deviations from standard are rapidly picked up.

4. Since there is no rest period between operations work in progress is at a minimum.

5. Again since there is no waiting period the provision of work in progress stores is unnecessary, and the total storage space required is significantly reduced.

6.Handling is reduced.

7. Control (including operations budgetary quality and supervisory control) is simplified the flow line being virtually self controlling .

8. Any weakness in materials or methods is immediately highlighted.

9. Materials requirements can be planned more accurately.

10. Investment in materials and resources used for a task can be more readily translated into income from sales.


Related Discussions:- Merits of continuous or flow production

What is benchmark for future comparison, Cunningham Performance Auto, Inc.,...

Cunningham Performance Auto, Inc., modifies 375 autos per year. The manager, Peter Cunningham, is interested in obtaining a measure of overall performance. He has asked you to prov

What are two reasons project management is not good, What are two reasons p...

What are two reasons project management is not well done in corporations? Why? What are some specific examples?

Explain instituting formal performance appraisal, What are some prerequisit...

What are some prerequisite conditions that must exist before instituting formal performance appraisal?

Comparison between method and work measurement, Comparison between method a...

Comparison between method and work measurement: Method  study  is the  principle   technique  for reducing  the work  involved  primarily by eliminating unnecessary  movement

Explain a key characteristic of a partnership, A key characteristic of a pa...

A key characteristic of a partnership is that each partner a. must contribute capital to the business b. shares in company assets upon the dissolution of the partnership c

Explain business systems analysis, Subject: Business Systems Analysis. Assi...

Subject: Business Systems Analysis. Assignment 4 Using the book 'Essentials of System Analysis and Design, 4th Edition Read the Hoosier Burger scenario on page 199 in Chapter 6 of

Explain what output rate will be achieved, An assembly line with 30 activit...

An assembly line with 30 activities is to be balanced. The total amount of time to complete all 30 activities is 42 minutes. The longest activity takes 2.4 minutes and the shortest

Explain what happens to throughput and cycle time, Consider a production sy...

Consider a production system that consists of a single station with a production rate of 1 part per minute and a process variability given by Ce=1. a) Suppose the system is run

Explain variable costs, Explain Variable costs. Variable costs converse...

Explain Variable costs. Variable costs conversely, tend to vary directly along with the volume of output. Illustrations of variable cost are: - * Direct production labour co

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd