Merits of Continuous or Flow Production1.The direct labor content will be reduced since the comprehensive pre planning which is necessary will often produce economies in time.
2.Assuming the product task is initially designed correctly the reproducibility and hence the accuracy and precision are high .
3.Since inspection is inline deviations from standard are rapidly picked up.
4. Since there is no rest period between operations work in progress is at a minimum.
5. Again since there is no waiting period the provision of work in progress stores is unnecessary, and the total storage space required is significantly reduced.
6.Handling is reduced.
7. Control (including operations budgetary quality and supervisory control) is simplified the flow line being virtually self controlling .
8. Any weakness in materials or methods is immediately highlighted.
9. Materials requirements can be planned more accurately.
10. Investment in materials and resources used for a task can be more readily translated into income from sales.
Step 1: Pick an industry that you find interesting. This may be driven by a company by which you would like to be employed or by some other factor. Within the industry, identify th
Model of behaviour modification and the four contingencies of reinforcement.(cited/referenced)
Since its release in 2001, the iPod has become a music player phenomenon. In your opinion, how would the QFD approach have helped Apple in developing the iPod? What are the limi
Explain work breakdown structure. Why do resource constraints affect project results?
Garden Variety Flower Shop uses 740 clay pots a month. The pots are purchased at $2 each. Annual carrying costs per pot are estimated to be 30 percent of cost, and ordering costs a
1. Your firm is considering an investment in a wind farm. Assume that the farm will cost $1 million per MW of installed capacity. The plan under consideration would deploy 10 GE 1.
in the context of motivation; level refers to----------- 1.an individual choice when present with a number alternatives/2.the consequences of an individual behaviour/3.the amount o
Do you have the test associated with the book Cost Management A strategic Emphasis, 5th edition
Explain the authorities under the Industrial Disputes Act, 1947. Ans: One of the authorities under the Industrial Disputes Act, 1947 for investigation and settlement of indu
Project Organisation - Operations Function The project system is a special category at the low-volume end of the spectrum. This entails the execution of many interdependent pa
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd