Merits of Continuous or Flow Production1.The direct labor content will be reduced since the comprehensive pre planning which is necessary will often produce economies in time.
2.Assuming the product task is initially designed correctly the reproducibility and hence the accuracy and precision are high .
3.Since inspection is inline deviations from standard are rapidly picked up.
4. Since there is no rest period between operations work in progress is at a minimum.
5. Again since there is no waiting period the provision of work in progress stores is unnecessary, and the total storage space required is significantly reduced.
6.Handling is reduced.
7. Control (including operations budgetary quality and supervisory control) is simplified the flow line being virtually self controlling .
8. Any weakness in materials or methods is immediately highlighted.
9. Materials requirements can be planned more accurately.
10. Investment in materials and resources used for a task can be more readily translated into income from sales.
As mentioned previously the MODI method is an efficient method of testing the optimality of a transportation solution. It may be recalled that in the application of the steppi
Explain how the EOQ technique helps explain the following: All things being equal, the production inventory quantity will be larger than the economic order quantity.
The following represents a project that should be scheduled using CPM: Time (DAYS) Activity Immediate Predecessors a m b A - 1 3 5 B - 1 2 3 C A 1 2 3 D A 2 3 4 E B 3 4 11 F
The G Banking Group recently reported that it was off shoring (moving) its back-office operations from European country D to India where it already has some significant operations.
Identify how the issues of due process and just cause are linked to employee disciplinary actions
An assembly line with 30 activities is to be balanced. The total amount of time to complete all 30 activities is 42 minutes. The longest activity takes 2.4 minutes and the shortest
Now, please answer the question regarding operations management. How would you describe the elements of Finagle a Bagels operating system?
Shalit Corporation's 2008 sales were $7 million. Its 2003 sales were $3.5 million. At what rate have sales been growing? Round your answer to the nearest hundredth.
Your proposal will have the following elements: (a) State your targeted problem/decision process Examples are: - Hotel Reservation Recommender System - Course Selection
1. Using Porter's Five Industry Forces, map the soft drink industry. 2. What are the risks and opportunities of the strategies followed by Pepsi? Of Coca Cola? 3. How would you res
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd