Mechanism of formation of soil plugs, Civil Engineering

Assignment Help:

Question

What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill?


Answer

Throughout initial driving process, open-ended steel piles are driven from side to side soils at their bases. Still, shaft friction will slowly develop between steel piles and soils inside piles at some time after pile driving. Hitting action of driving hammers induces forces to soil and later it comes to a stage when inertial forces of inside soils, together with inner frictional forces more than bearing capacity of soils at pile toes. As a result, soil plug formed is brought down by the piles.

 


Related Discussions:- Mechanism of formation of soil plugs

Non-distortional prestressing, Non-distortional Prestressing Concrete m...

Non-distortional Prestressing Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to

Determine the analysis of presress, Analysis of presress  In pre-stress...

Analysis of presress  In pre-stressed structural elements, stretched tendons are placed inside concrete. The tensile stresses of the tendons are transferred to concrete in the

Cost-volume-profit and break even analysis, Cost-Volume-Profit and Break Ev...

Cost-Volume-Profit and Break Even Analysis: Cost-volume-profit analysis helps us to learn the behaviour of cost and profit in response to varying level of business activity. I

Rail tensors, A hydro stressor consists essentially of a hydraulic pump whi...

A hydro stressor consists essentially of a hydraulic pump which transmits its force through connecting vans to clamps which grips the rail. In case of mechanical tensor the force i

Conditions of pumping performance, Question In conditions of pumping pe...

Question In conditions of pumping performance, how have to engineers determined use of radial flow pumps and axial flow pumps ? Answer Exact speed is usually define

Can you explain permeable spurs, Q. Can you explain Permeable Spurs? A ...

Q. Can you explain Permeable Spurs? A permeable spur may be constructed by driving two or more rows of bally piles with sufficient penetration below riverbed level to provide a

State the angle of inclination of the failure plane, The stresses at failur...

The stresses at failure on the failure plane in a cohesionless soil mass were: Shear stress = 4 kN/m 2 ; normal stress = 10 kN/m 2 . Verify the resultant stress on the failure plan

What is over vibration of fresh concrete, Q. What is Over vibration of fres...

Q. What is Over vibration of fresh concrete? For proper compaction of concrete by immersion vibrators, vibrating part of the vibrators must be completely inserted into the conc

Transportation issues, "We have one other pressing challenge that you could...

"We have one other pressing challenge that you could review for us," Alistair Wu says. "As you know, the Shanghai plant was our first facility in China, but we also have two other

Specification of flooring for heavy repair shed, Q. Specification of Floori...

Q. Specification of Flooring for heavy repair shed? Scope for use - For flooring for heavy repair shed, Surface hardened concrete flooring can used. In this type of flooring,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd