What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill?
Answer Throughout initial driving process, open-ended steel piles are driven from side to side soils at their bases. Still, shaft friction will slowly develop between steel piles and soils inside piles at some time after pile driving. Hitting action of driving hammers induces forces to soil and later it comes to a stage when inertial forces of inside soils, together with inner frictional forces more than bearing capacity of soils at pile toes. As a result, soil plug formed is brought down by the piles.
Q. What is Preset in bridge bearing? 'Preset' is a method to decrease the size of upper plates of sliding bearings in order to save cost. Normal length of an upper bearing plat
Q. Settlement due to Reduction in Volume of Soil? The weight of the structure causes reduction in volume of soil due to expulsion of pore water from the voids. This reduces the
Details of a simply-supported beam are given in Figures (a) and (b). Note that the dead load, g includes the self weight. Design the transverse shear reinforcement in ter
Q. What do you mean by Ozone Test? Some research and studies determined that the ozone test was unnecessary as this affects only the surface layer. In un-stretched rubber, ozo
Q. For what capacity would you design a sanitary branch sewer to serve a section having a population of 12500 persons with a rate of supply of 135 Liters. Ans.- Average flow
Question-Why is span length ratio of end span, approach span to its neighbouring inner spans typically about 0.75? Answer-From aesthetic point of view, odd number of span
Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and
A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft
Description of paint
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd