Mechanism of formation of soil plugs, Civil Engineering

Assignment Help:

Question

What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill?


Answer

Throughout initial driving process, open-ended steel piles are driven from side to side soils at their bases. Still, shaft friction will slowly develop between steel piles and soils inside piles at some time after pile driving. Hitting action of driving hammers induces forces to soil and later it comes to a stage when inertial forces of inside soils, together with inner frictional forces more than bearing capacity of soils at pile toes. As a result, soil plug formed is brought down by the piles.

 


Related Discussions:- Mechanism of formation of soil plugs

Specification of water bound macadam road, Q. Specification of Water bound ...

Q. Specification of Water bound macadam road? Formation - The embankment for road shall be made to the cross section shown on the drawing. The bank shall be raised in regular

Concrete structural members tensile stresses, Concrete structural members t...

Concrete structural members tensile stresses In concrete structural members tensile stresses act in a longitudinal direction. This is why, stretched tendons (hereafter, called

Construction equipments, what is preventive maintenance and state its advan...

what is preventive maintenance and state its advantages

Direction of approaching velocities of ships during berthing, Q. Direction ...

Q. Direction of approaching velocities of ships during berthing? One of the key effects of angle of approaching velocities of ships is its influence of energy to be absorbed by

Determine the major and minor principal effective stresses, The stresses ac...

The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin

Calculate the amount of cubic yards of soil, A proposed building site requi...

A proposed building site requires 135,000-ft 3 of imported fill.  A borrow site is located 5-miles Northeast of the project site where the soil has a shrinkage of 16%.  The amount

Show disadvantages of excessive concrete covers, Q. Disadvantages of excess...

Q. Disadvantages of excessive concrete covers? In reinforced concrete structures cover is generally provided to protect steel reinforcement from corrosion and to provide fire r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd