Mechanical piping material specifications, Mechanical Engineering

Assignment Help:

The Specifications for use on a project will be as defined in the ‘Project Execution Plan'. The specification requirements will be clarified in the Engineering Estimate or at the Preliminary Engineering Phase of the work. The Mechanical Engineer/Specialist will be responsible for maintenance, distribution, updating and/or generation of Specifications as required.

A number of WorleyParsons Technical Specifications exist. These Specifications are intended as minimum mandatory requirements to be complied with by Vendors. WorleyParsons Technical Specifications should be reviewed on a Project basis to determine applicability to a given Project. They may then be adopted ‘as is', or supplemented by a Project specific Addendum or revision. During the evaluation for Project suitability, should it become apparent that a particular revision may be required to the Corporate master Specification, the Mechanical Department head shall be notified.


Related Discussions:- Mechanical piping material specifications

Local stresses - vessel rigging analysis, Q. Local Stresses? Local stre...

Q. Local Stresses? Local stresses in the vessel shell/head/skirt/base rings from the lifting attachments (such as lugs, trunnions, etc.), shall be determined for the imposed lo

Impulse turbine, IMPULS E TURBINE: The steam turbine in which the ste...

IMPULS E TURBINE: The steam turbine in which the steam expands while passing through nozzle and remains at the constant pressure over the blades is called as impulse turbine.

Electro gas welding, ELECTRO GAS WELDING This process is an extension ...

ELECTRO GAS WELDING This process is an extension of MIG  I MAG welding, designed for single pass vertical welding of steel plates in the thickness range of 10 to 38 mm. The tw

What is bolt elongation, Q. What is Bolt Elongation? The required bolt ...

Q. What is Bolt Elongation? The required bolt elongation Δ 1 may be calculated by the equation (7): Δ 1 = 3.25 * 10-8 * SB * L0 (in) (7) Where L 0 is the effect

Optimization, consider the following LPP max z=9x1+8x2+5x3 subject to 2x1+3...

consider the following LPP max z=9x1+8x2+5x3 subject to 2x1+3x2+x3 5x1+4x2+3x3 x1,x2,x3>_0 (a)solve using simlex method (b)hence using the sesitivity analysis,find the new optima

Evaluate the temperature gradient in the flow direction, A plane wall (ther...

A plane wall (thermal conductivity = 10.2 w/m o c) of 100 mm thickness and area 3m 2 has steady surface temperature of 170 o c and 100 o c. Evaluate :- (i) The temperature

Wilson-Hartnell Governor:, A Wilson-Hartnell governor is illustrated in giv...

A Wilson-Hartnell governor is illustrated in given Figure. In this, the balls are associated by two springs that are known as main springs. The main springs are symmetrically arran

Combined rules- priority rules-conventional priority rules, Combined Rules ...

Combined Rules           MOD (modified operation due date)                                 PN j = max (t + o j , t dj ) (SPT-Tr) (Truncated SPT)

Answer me, Produce as individuals a single tab Excel spreadsheet which show...

Produce as individuals a single tab Excel spreadsheet which shows a rough initial design for a water treatment plant taking 15MLD of water with 100 mg/l SS from a lake at 750mAOD,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd