Meaning and definition, Operation Research

Assignment Help:

Meaning and Definition

If a group  of N observations is  arranged in ascending or descending  order of magnitude then the  middle  value is  called  median of  these  observations  and is  denoted  by M or Me. That  is       M= N+1/2 th  observation.

According  to Prof. L. R. Conner The median is that value  of the  variable which  divides  the group into  two equal  parts  one part  comprising of all values greater and the other all values  less than  the median.

According  to Yule and Kendall " The  median may be  defined  as the middle  most or central values of  the variable  when the  values  are arranged in order of  magnitude or as the value  is such that the  greater and smaller values  occur with equal  frequency.

 


Related Discussions:- Meaning and definition

Assignment problem, a c++ program to implement assignment problem??????????...

a c++ program to implement assignment problem???????????

What is the temperature of water leaving the chillier, A water chillier wit...

A water chillier with a capacity of 30 TR cools 20 m 3 /hr. water entering at 12 o C what is the temp. of water leaving the chillier. A reversible engine has an ideal thermal ef

Hypothesis building and testing, Hypothesis  Building and Testing The...

Hypothesis  Building and Testing The foundation of hypothesis building  lies in discovering links between  elements  of your data. CAQDAS can help you to  discover these links

Histogram and historigram, #qudistinguish between histogram and historigram...

#qudistinguish between histogram and historigram estion..

Steps of field study, Festinger and Katz have described followings six ste...

Festinger and Katz have described followings six steps in the conduct to a field study. a. Preliminary Planning :Deciding scope and objectives of study and the time table

Construction procedure for research tool, CONSTRUCTION PROCEDURE The c...

CONSTRUCTION PROCEDURE The construction of an interview schedule or questionnaire is a time consuming task requiring considerable attention to all the details. The investig

Sequensing problem, job- 1 2 3 4 5 6 7 t1- 3 12 15 6 10 11 9 t2- 8 10 10...

job- 1 2 3 4 5 6 7 t1- 3 12 15 6 10 11 9 t2- 8 10 10 6 12 1 3

Optimal assignment, Six Operators are to be assigned to five jobs with the ...

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Vogel approximation methods, This method is more  systematic and orderly th...

This method is more  systematic and orderly than least cost method. Here penalties for each column and row of the transportation table are determined, and the row  or  column with

Operations research 2, management wants to know how many supervisors should...

management wants to know how many supervisors should be hired, and what could be the optimum workload distribution to be applied, given a number of constraints

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd