MATLAB support for fault analysis in transmission lines, Electrical Engineering

Assignment Help:
The devices in power system shown in Figure 2 have the following ratings:

G1 : 100 MVA, 13.8 kV grounded Y, X” = 0.15 pu, X2 = 0.015 pu Xo = 0.05 pu
G2 : 50 MVA, 20.0 kV grounded Y, X” = 0.15 pu, X2 = 0.015 pu Xo = 0.05 pu
T1 : 100 MVA, 13.8/138 kV (both grounded), X1 = 0.08 pu, X2 = 0.08 pu Xo = 0.08 pu
T2 : 50 MVA, 20.0/138 kV, ?-Y grounded Y, X1 = 0.08 pu, X2 = 0.08 pu Xo = 0.08 pu
L1 : 100 MVA, 138 kV grounded X1 = 19 ?, X2 = 19 ?, Xo = 50 ?,


Figure 2

Assume that all resistances in the power system can be neglected. The system base apparent power is ____ (to be specified by your lecturer)MVA, and the base line voltage is 13.8 kV at bus 1. Assume that the voltage at bus 1 is 13.8 kV and that the power system is initially unloaded.

2. Use Matlab to:

a. Find the sub transient per-phase equivalent circuits of this power system for positive-, negative- and zero-sequence component.

b. Find the subtransient fault current at the fault found at the location indicated by X for:



i) A symmetrical three-phase fault
ii) A single line-to-ground fault
iii) A line-to-line fault
iv) A double line-to-ground fault

(A student will solving for the transient fault line current for two (2) types of fault to be specified by the lecturer).

Related Discussions:- MATLAB support for fault analysis in transmission lines

DC motor & encoder, If a high resolution emcoder is used for position contr...

If a high resolution emcoder is used for position control, will the number of pole count in the DC motor be matter? What is the requirement for the DC motor in order to work with h

Oscillator circuit with the help of block diagram, Q. Explain the condition...

Q. Explain the conditions to be satisfied for sustained oscillations in an oscillator circuit with the help of block diagram. The essential condition for sustained oscillations

High level language - third generation language , High Level Language ( thi...

High Level Language ( third Generation Language ) The difficulties of low  level  languages are overcome  by high  level languages. In  assembly  language  mnemonics  were used

Types of meter test, Types of Meter Test A meter should pass the subse...

Types of Meter Test A meter should pass the subsequent two types of tests: Type Tests Routine Tests Meters are calibrated such in which the whole

Activities to preparing long-term plans, Activities to Preparing Long-term ...

Activities to Preparing Long-term Plans 1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to cons

Write a short note on the working of darlington amplifier, Q. Write a sho...

Q. Write a short note on the working of Darlington Amplifier? A Darlington Amplifier is one that is employing the Darlington pair of transistors. It is a

Low investments in transmission and distribution system, Low Investments in...

Low Investments in Transmission and Distribution System The investment on T&D system in our country has commonly been lower than that on generation. It is hugely believed in

Bureau of energy efficiency, Bureau of Energy Efficiency Setting up o...

Bureau of Energy Efficiency Setting up of the Bureau of Energy Efficiency The Bureau of Energy Efficiency has been established with effect from 1st March, 2002 under the

100 line exchange with two-motion line finders, In this design, there are 2...

In this design, there are 24 line finders. If any of the 100 subscribers has to get access to any of 24 two-motion selectors, it is necessary that every line finder is capable of r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd