Spacing of manholes in straight sections, Civil Engineering

Assignment Help:

Question

Spacing of manholes in straight sections for diverse pipe sizes is stated in Storm water Drainage Manual. How are figures arrived on?

Answer

For pipe size is less than 300mm, rodding is typically adopted in which workers place about 1m long rods during pipes to location of blockage and physically operate the rod to clear blockage.

For pipe size is less than 700mm, water-jetting is generally working in which water is supplied from nearby fire hydrants and pressurized water jet is used for clearing obstacle.Winching scheme is adopted for every size of pipes.

For example, for pipe size more than 1050mm, it is stated in Storm water Drainage Manual that utmost intervals between manholes length of straight lengths should be 120m. This is as for sizes over 1050m; main method of pipe maintenance is by winching whose utmost length of operation is 120m. Likewise, highest intervals of manholes for other directly pipes are derived from their corresponding protection processes.


Related Discussions:- Spacing of manholes in straight sections

Concrete compaction in piling works, Question What is the reason that v...

Question What is the reason that vibrators not used in concrete compaction in piling works ? Answer Concrete for piles must be a high-slump self-compacting mix that i

Friction dampers, what is friction damper and there types?

what is friction damper and there types?

Explain the unit hydrograph - hydrology, Define Unit Hydrograph Hydrogr...

Define Unit Hydrograph Hydrograph of one inch or 1cm of precipitation over a drainage basin area (watershed). It is the base hydrograph from which other hydrographs can be dete

Resting on several raking piles, Question Should dolphins be designed i...

Question Should dolphins be designed in a rigid manner such as resting on several raking piles? Answer While designing dolphins, they are normally supported on a syste

Reasons for blockage in pumping concrete, Q. Reasons for blockage in pumpin...

Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction

Explain standard penetration test used in soil exploration, Explain the "St...

Explain the "Standard Penetration Test" used in soil exploration. List the information that can be obtained by the test when made in (a) clay, (b) sand. Comment on the correctio

For the plane area shown determine the first moments, for the plane area sh...

for the plane area shown determine the first moments with respects to the x & y axis & the location of the centroid

How to evaluate quality of bricks, Q. How to evaluate quality of Bricks? ...

Q. How to evaluate quality of Bricks? 1. Clour -Deep red, Carry red, Copper red, colour is indication of uniform burning and also suggests quality of clay used. Over brunt bric

Deflection of beams, 1) A propped cantilever beam ABC is 7m long.It has th...

1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KN

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd