Maintenance of earth roads, Civil Engineering

Assignment Help:

Maintenance of Earth Roads:

The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and there is adequate camber for surface run-off. A motor grader is ideal for the purpose. In its absence, an agricultural tractor towing a blade grader can be used. A drag (Figure) towed by an agricultural tractor or animals or humans can eliminate the corrugations.

2165_Maintenance of Earth Roads.png

Figure: Drag


Related Discussions:- Maintenance of earth roads

Explain sedimentation, Explain Sedimentation 1. Sedimentation bas...

Explain Sedimentation 1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period 2. Basins are usually rectangular or

Physics, about lenses & mirrors for assignment

about lenses & mirrors for assignment

Concreting, #question why cracks develops on the surface of concrete on the...

#question why cracks develops on the surface of concrete on the next day of casting?

Explain the tertiary treatment for wastewater, Explain the Tertiary Treatme...

Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Consideration of hazards in design, • Gas turbines produce noise, heat radi...

• Gas turbines produce noise, heat radiation and exhaust gas emissions that are potentially a danger to health • Fuel is flammable and there are hot surfacesand moving parts

Common defects - bituminous roads, Common defects - bituminous roads: ...

Common defects - bituminous roads: Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt. If an overlay is to be laid on a cracke

Building plan, the conventional symbol used in building plan

the conventional symbol used in building plan

Determine the water-cement ratio, A concrete batch plant provided the Desig...

A concrete batch plant provided the Design Strength for the engineer's mix design to match the project's specification requirement for a 4000 psi Tremie pump mix.  The Water-cement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd