Maintenance of aircraft under “b” conditions, Other Engineering

Assignment Help:

Maintenance of Aircraft under “B” conditions: 

The maintenance of aircraft flying under "B" conditions must be adequate in relation to the number and duration of the flights. If a prolonged sequence of flights is expected, a programme of maintenance must be prepared. Procedures shall be in place to ensure that provision is made for any additional maintenance which may arise from development or modification of the aircraft whilst under "B" conditions.

The aircraft shall be certified as 'fit for flight' after maintenance in accordance with the preceding paragraph.

On completion of all flights under "B" conditions, a Flight Test Certificate must be completed by the pilot/captain and all annotated defects rectified or re-tested.

Once the first flight has been satisfactory completed, a series of subsequent flights establish the airworthiness of the aircraft with regards to speed and height envelopes, noise, specific fuel consumption, handling qualities and many other characteristics needing to be quantified.

Each flight must be in accordance with a flight test schedule which has been drawn up by the manufacturer and approved by the C.A.A. (See extract from BCAR A2-3 below)

The applicant shall submit for approval a flight test schedule, containing details of the proposed flight tests to be included in the Airworthiness Acceptance Trials. This schedule shall include the flight tests necessary: 

(a) To establish compliance with the appropriate airworthiness requirements.

(b) To provide information for inclusion in the documents associated with the Certificate of Airworthiness (Or Permit to Fly - see later).

NOTE:    The C.A.A. may require alterations to the flight test schedule, and may also require additional tests not included in the schedule if it appears that such test are necessary to establish the airworthiness of the aircraft type.


Related Discussions:- Maintenance of aircraft under “b” conditions

Engine drains, ENGINE DRAINS. There are two types of drains: • Con...

ENGINE DRAINS. There are two types of drains: • Controlled drains - the result of normal operation. • Uncontrolled drains - the result of abnormal operation. CONTROLLE

Instruction set, compare zero- one- two- and three-address machines by writ...

compare zero- one- two- and three-address machines by writing programs to compute X=(A+B*C)/(D-E*F)

Wire drawing, Wire Drawing involves pulling the metal through a die by mea...

Wire Drawing involves pulling the metal through a die by means of tensile force applied to the exit side of the die.          A typical wire drawing operation is shown in fig.

Petroleum Production.., 1. . Using the graph of pore/fracture pressure for ...

1. . Using the graph of pore/fracture pressure for the Holly Field propose a casing scheme for the well using the graphical approach. Discuss the suitability of the selected casing

instrumentatiion, can i get block dig of digital frequency meter

can i get block dig of digital frequency meter.

Heat and mass transfer, 1. Air at 1 atm, 90F, and 8 ft/s enters a thin-wall...

1. Air at 1 atm, 90F, and 8 ft/s enters a thin-walled tube of 4-in diameter. The tube surface temperature is maintained at 60F. Air exits the tube at 70F. Determine the length of t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd