Main concern regarding design of pavements, Civil Engineering

Assignment Help:

Question

If In case a road passes from side to side a reclaimed land and an existing land, what is key main concern regarding design of pavements?


Answer

For a breathing land, it is likely that there would be no major resolution within design life of pavement structures. Though, for a just reclaimed land, even with surcharging and installation of a vertical drain, a little settlement will at rest occur after construction. If road pavement has to be constructed linking these two areas, special design has to be made in transition region. In command to avoid occurrence of differential settlement which could damage pavement structure, a transition slab can be designed to accommodate such association.

 


Related Discussions:- Main concern regarding design of pavements

Prestressed concrete structures, Distinguish between uniaxial biaxial and t...

Distinguish between uniaxial biaxial and triaxial prestressing

Calculate the total cost for the project, The total equipment cost for an a...

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Precast pile, when a precast pile is single point lifting and when double p...

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

State the coulomb earth pressure theory, A masonry wall with vertical back ...

A masonry wall with vertical back has a backfill 5 m behind it. The ground level is horizontal at the top and the ground water table is at ground level. Measured the horizontal pre

Determine the geometrical parameters for layout, Q. A crossover is to be la...

Q. A crossover is to be laid between two parallel B. G. tracks at 4.725 m centers by using 52 kg, 1 in 8½ and 1 in 12 turnouts. For this layout, i. Determine the main geometrica

Scaffolding, definition for double type scaffolding

definition for double type scaffolding

Explain the national primary drinking water standards, Explain the National...

Explain the National Primary Drinking Water Standards Safe Drinking Water Act (SDWA, 1974) required EPA to establish maximum contaminant levels (MCLs) for public water systems

Biological wastewater engineering, a. We put a lot of time and effort into ...

a. We put a lot of time and effort into cultivating our activated sludge microbial community. So why do we waste sludge out of it? b. A wastewater discharges to Puget sound, a mari

Cantilever beam, can i use lockfix to making cantilever beam

can i use lockfix to making cantilever beam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd