Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question
If In case a road passes from side to side a reclaimed land and an existing land, what is key main concern regarding design of pavements?
Answer For a breathing land, it is likely that there would be no major resolution within design life of pavement structures. Though, for a just reclaimed land, even with surcharging and installation of a vertical drain, a little settlement will at rest occur after construction. If road pavement has to be constructed linking these two areas, special design has to be made in transition region. In command to avoid occurrence of differential settlement which could damage pavement structure, a transition slab can be designed to accommodate such association.
Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr
Bonding performance to concrete: Epoxy-coated bars vs. galvanized bars Based on the findings of CEB Bulletin 211 the bonding of galvanized bars to concrete is lower in early
what is imperfect frames ?
The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin
Retaining Walls: Needed to retain the fill portion, and generally constructed in dry stone masonry with pucca bunds (Figure). Figure: Typical Design for a Retaining
what are the obstacles in chain survey in brief
The two plates shown below are each 10-in. wide by ¾- in. thick. The gage distance, g, and the longitudinal spacing on each member is set at 4-in. Determine the axial strength of t
How to prove that heat and work are the path functions?
Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on
What is the smallest size of A325 bolts required for the two plates in tension noted below, assuming the thickness of each plate is 1.0-in. and the applied force at each end is P=2
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd