What are main and key benefits of piers constructed monolithically with bridge deck over usage of bearings?


Related Discussions:- Main and key benefits of piers constructed monolithically

Estimation of loading carrying capacity, Question While designing mini...

Question While designing mini-piles , should strength of grout be disused during estimation of loading carrying capacity? Answer While designing min-piles, there will

Earth dam, earth dam design and its force

earth dam design and its force

Grouting in segmental linings in tunnels, Q. Grouting in segmental linings ...

Q. Grouting in segmental linings in tunnels? Grouting is typically carried out under pressure in segmental linings at the time of tunnel construction due to the below reasons:

Keywords of airport management, Keywords of Airport management: Air T...

Keywords of Airport management: Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Is kerb necessary in road pavements, Question Is kerb necessary in road...

Question Is kerb necessary in road pavements? Answer In universal, kerbs are crucial in road pavements due to next cause- (i) They supply strength to sides of road

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

12/5/2013 6:49:23 AM

Mostly, piers constructed monolithically with bridge deck are gainful in the following ways-


(1) Movement of bridge deck is achieved by t bending deformation of long and slender piers. In this way, it keeps construction cost of bearings by using monolithic construction connecting bridge deck and piers. Additionally, it is not basic to spend extra effort to design for drainage details and access for bearing substitution. On other hand, in protection aspect substantial rate and time savings can be obtained by using monolithic construction in its place of using bearings as bridge articulation.

 

(2) Monolithic construction possesses shortest effective Euler buckling length for piers since they are fixed supports at interface between bridge deck and piers.

 

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd