In assortment of dams in drainage channels, what are the main advantages of using rubber dams instead of steel-gate dams?

Answer

Key Advantages of rubber dams are as follows-
(i) As rubber is bendable in nature it is capable of performing depression even in presence of dirt and sedimentation on downstream side. Though, for rigid steel-gate dams, it might not be possible to open when there is extreme sediment.

(ii) As foundation of rubber dams is reasonably lighter than that of steel-gate dams, it saves both construction price and occasion.

(iii) Rubber dams are able to be planned with longer spans without piers as steel-gate dams require intermediate piers for long spans.

 

 


Related Discussions:- Main advantages of using rubber dams

Time to remove formwork to cater for early thermal movement, Q. Time to rem...

Q. Time to remove formwork to cater for early thermal movement? Let's take a circular column as an illustration to explain effect of internal restraint to thick sections.  W

Cross drainage work, Cross Drainage Work: Several natural streams, ri...

Cross Drainage Work: Several natural streams, rivers and canals cross the road. They have to be led across the road through culverts and bridges. That given structures is kno

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

Calculate the square foot of contact area for the formwork, A concrete crew...

A concrete crew will use the available steel form panels measuring 2'-6" wide x 4'-0" high to construct a 40'-6" long by 3'-2" high by 1'-6" wide concrete knee wall. The square

Estimate the activity durations - construction management, Estimate the Act...

Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440.  The average crew-hour cost is $15,879 for this

Bridge engineering, How to calculate economic span of ss bridge

How to calculate economic span of ss bridge

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd