Machine Load Chart

In machine load chart time is marked along horizontal axis and various machines are marked along the vertical axis. The orders by their number
Have been marked on the horizontal firm lines as shown in figure above.

Limitations of Gantt Chart

1. If the project consists of too many activities, it becomes clumsy to draw the Gantt chart. Due to this bar chart is not useful for big projects consisting of large number of complex activities.

2. The chart does not give any data about what exactly is completed and what is not as the chart does not shown events between the bars.

3. As the chart combines plan and schedule, it is difficult to known whether the activities have optional starting dates.

4.The chart does not exhibit the dependencies or inter relationship between the activities and as such it id difficult to say, what will be the effect of delay of one activity over the other or the entire project.

5. Gantt charts are not a tall useful in those projects where there are uncertainties in determination or estimation of time required for the completion of various activities.

These charts are useful for only small size conventional projects specially construction and manufacturing in which time estimates can be made with fair degree of uncertainty.


Related Discussions:- Machine load chart

Objectives of operation process chart, Objectives of Operation Process char...

Objectives of Operation Process chart 1. It helps to decide whether a further and more detailed record is needed. 2. It is used in the design stages to assist the layout of th

Characterize the long run equilibrium, 1) characterize the long run equilib...

1) characterize the long run equilibrium of a perfectly competitive industry in which average costs are U-shaped as output increases, under both restricted and free entry. b)Discus

Explain exponential smoothing, An electrical contractor's records during th...

An electrical contractor's records during the last five weeks indicate the number of job requests Week: 1 = 22 requests 2= 24 requests 3= 20 requests 4= 23 requests 5= 24 requests

Explain what opportunities in the marketing environment, What opportunities...

What opportunities in the marketing environment did Gannet seize in launching USA? What unmet benefits are added and what value is created for the customer by USA Today?

MBA-2, What do you understand by"line balancing"?What happens if balance do...

What do you understand by"line balancing"?What happens if balance doesn''t exist?

Products produced by project, 1. Identify products which you would expect t...

1. Identify products which you would expect to be produced by each of the following configurations: project, job shop, and batch and continuous. Answer: Many possible answers:

Describe the impact that batch size has on flow, Explain the impact that ba...

Explain the impact that batch size has on flow. Explain why the EOQ formula works.

Explain the key factors in effective project control, Identify and describe...

Identify and describe the key factor(s) in effective project control.

Explain bruce wayne routinely participates in activities, Bruce Wayne routi...

Bruce Wayne routinely participates in activities such as skydiving, rock climbing and bungy jumping. His employer told him to stop the activities or they would cancel his health in

Explain four ps of marketing, Explain Four 'P's of Marketing. Four 'P'...

Explain Four 'P's of Marketing. Four 'P's of Marketing : Marketing may be described as a human activity directed at satisfying wants and needs by exchange processes. A market

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd