It is difficult  to set  down rules whereby the problem  of facilities  location  can be  programmed but  there  are a number of factors which  should be  considered. It is worth differentiating between the problem s of location and   of site the location is the general area, and the site is the place chosen within the location. The decision on sitting thus probably proceeds in two stages: in the first the general area is chosen and then a detailed survey of that area is carried out to find possible sites. The final decision is made by taking into account more detailed requirements.


Related Discussions:- Location strategy

Benefits long-term employees in the firm''s home country, Under what condit...

Under what conditions is it ethically defensible to outsource production to a developing world where labor costs are lower when such actions also involve laying off long-term emplo

Compute the labour productivity, 10 person assembly line, 160 valves produc...

10 person assembly line, 160 valves produced during 8 hour shift, calculate the labour productivity

What is queuing theory in operation management, What is queuing theory in o...

What is queuing theory in operation management? Queuing theory is usually seems a branch of operations management since the results can be used to plan for resources require

Class work, define the following key terms in product layout: a) Product in...

define the following key terms in product layout: a) Product interval time b) Product duration (throughput time) c) Assembly line balancing

Variety management, what are the different methods of variety management of...

what are the different methods of variety management of manufactured goods

Explain panel interviewing and its strengths and weaknesses, You're going t...

You're going to have to stretch your imagination for this question:. Assume you're involved in a panel interview team. Identify one strength and one weakness in this interview appr

Draw a diagram of the factory and finding the maximum rate, Factory is a ba...

Factory is a bathtub with 50 gallons capacity, drain is outlet to market and can output 3 gallons per hour. Faucet is raw material input and allows materials in at a rate of 4 gall

Explain city water supply system, The network in figure below shows the pip...

The network in figure below shows the pipeline transportation system for treated water from the treatment plant (node 1) to a city water supply system (node 14). The arc capacities

Project MAnagement, A firm uses three machines in the manufacturing of thre...

A firm uses three machines in the manufacturing of three products: Each unit of product 1 requires three hours on machine 1, two hours on machine 2 and one hour on machine 3.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd