Load Balancing and Load Management
It has been observed in which the load on all three phases of a distribution line and between the feeders is not balanced. This output in increased current in the heavily loaded line along with increased line losses. If the loads on each phase or between feeders are redistributed, the losses will be reduced. Shifting of consumers for the overloaded phase should be completed to decrease the imbalance in the system. The best technique to identify unbalancing is to construct current duration curves for all three phases.
In the scenario of overloaded distribution systems, load management plays an extremely significant role for reduction of technical losses. Load management is significant to ensure supply to feeders feeding critical emergency loads, curtailing supply to other loads and shifting of loads among feeders.To avoid overloading of lines and transformers in real time mode, modern features such as distribution automation might be incorporated. Distribution automation along with SCADA (Supervisory Control and Data Acquisition System) is a significant tool for load management that should be introduced.
Direct Tapping and Unmetered Connections Direct Tapping Direct tapping of power by non-customers is widely prevalent. This is mainly in domestic and agricultural categori
A three-phase transposed line is composed of one ACSR conductor per phase with flat horizontal spacing of 11 meters as shown in Figure (a). The conductors have a diameter of 3.625
What is faithful amplification. What are basic condition for faithful amplification. Describe : (a) Peak Inverse voltage. (b) Maximum forward current. (c) Knee voltage
reading type of cro probe
A three-phase, four-pole, 220-V, 60-Hz induction machine with a per-phase resistance of 0.5 is operating at rated voltage as a generator at a slip of -0.04, delivering 12 A of li
Working and block diagram
The power transferred across the air gap of a two pole inductionmotor is 24 kW. If the electromag netic power developed is 22 kW, find the slip. Calculate the output torque if the
Explain the 8259 microprocessor. 8259: The 8259A adds 8 vectored priority encoded interrupts to the microprocessor. This can be expanded to 64 interrupt requests with us
how does creating a supernode helps solve the problems?
What is current electricity
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd