Load Balancing and Load Management
It has been observed in which the load on all three phases of a distribution line and between the feeders is not balanced. This output in increased current in the heavily loaded line along with increased line losses. If the loads on each phase or between feeders are redistributed, the losses will be reduced. Shifting of consumers for the overloaded phase should be completed to decrease the imbalance in the system. The best technique to identify unbalancing is to construct current duration curves for all three phases.
In the scenario of overloaded distribution systems, load management plays an extremely significant role for reduction of technical losses. Load management is significant to ensure supply to feeders feeding critical emergency loads, curtailing supply to other loads and shifting of loads among feeders.To avoid overloading of lines and transformers in real time mode, modern features such as distribution automation might be incorporated. Distribution automation along with SCADA (Supervisory Control and Data Acquisition System) is a significant tool for load management that should be introduced.
Q. Find the voltage gain of the overall circuit? (a) Consider the circuit of the inverting amplifier shown in Figure (a), including an ideal op amp. Show that the voltage gain
For the circuit of Fig: (i) using Kirchoff's Laws , find all the currents (ii) determine the voltage across each resistor and check that all loops comply with KVL (iii
Q. Determine the armature current and torque angle? A 1500-hp, 6600-V, six-pole, 60-Hz, three-phase, wye-connected, synchronous motor, with a synchronous reactance of 36 , neg
Consider an electromagnet, as shown in Figure, which is used to support a solid piece of steel and is excited by a coil of N = 1000 turns carrying a current i = 1.5 A. The cross-se
Earth Leakage : Earth leakage takes place when, through some fault in an appliance or its connections. Electric current escapes to earth i.e. the body of the appliance become 'liv
Jump Instruction There are two types of jump instruction unconditional jump conditional jumps
Determine the change in IC from 25ºC to 175ºC for the transistor defined in this table for fixed-bias with RB = 240 k and = 100 due to the S(VBE) stability factor.
Explain the term full duplex transmission. Data can travel in both directions concurrently. There is no require to switch from transmit to receive mode as in half duplex. It's
Q. A transistor is connected in common emitter configuration collector supply voltage Vcc is 10 volts load resistance Rl is 800ohm,voltage drop across load resistance is 0.8v and c
Control Charts The control chart is the fundamental tool of Statistical Quality Control (SQC). It denotes the general cause variation in which is built into a system therefore
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd