Load Balancing and Load Management

It has been observed in which the load on all three phases of a distribution line and between the feeders is not balanced. This output in increased current in the heavily loaded line along with increased line losses. If the loads on each phase or between feeders are redistributed, the losses will be reduced. Shifting of consumers for the overloaded phase should be completed to decrease the imbalance in the system. The best technique to identify unbalancing is to construct current duration curves for all three phases.

In the scenario of overloaded distribution systems, load management plays an extremely significant role for reduction of technical losses. Load management is significant to ensure supply to feeders feeding critical emergency loads, curtailing supply to other loads and shifting of loads among feeders.To avoid overloading of lines and transformers in real time mode, modern features such as distribution automation might be incorporated. Distribution automation along with SCADA (Supervisory Control and Data Acquisition System) is a significant tool for load management that should be introduced.


Related Discussions:- Load balancing and load management

Pentium processor has a superscalar architecture, Q.‘Pentium processor has ...

Q.‘Pentium processor has a superscalar architecture'. Describe the meaning of statement. Ans:Pentium microprocessor is organized with three execution units. One executes float

Integrated circuit with resistive feedback, principle of resistive feedback...

principle of resistive feedback circuit change when the square wave and triangular pulse frequencies, the amplitude of the triangle wave

Phantom or fictitious loading method, Phantom or Fictitious Loading Method ...

Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and

Checking at site - testing of meter, Checking at Site - Testing of Meter ...

Checking at Site - Testing of Meter The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's install

Energy conservation , Energy conservation: NEP envisages a voluntary a...

Energy conservation: NEP envisages a voluntary approach initially for promoting energy conservation along with emphasis on labelling of appliances. Gradually as awareness incr

Determine the voltage regulation at full load, A three-phase, wye-connected...

A three-phase, wye-connected, cylindrical-rotor synchronous generator rated at 10 kVA and 230  V has a synchronous reactance of 1.5per phase and an armature resistance of 0.5  pe

Determine the remaining voltages and currents, Q. Some element voltages and...

Q. Some element voltages and currents are given in the network con?guration of Figure. Determine the remaining voltages and currents. Also calculate the power delivered to each ele

Explain the magnetisation- curves of magnetic materials, Explain the magnet...

Explain the magnetisation- curves of magnetic materials. The major characteristic of a ferromagnetic substance is domain structure of it. Every crystal of a ferromagnetic subst

Find kfm for the modulator using carsons rule, Q. A commercial FMstation br...

Q. A commercial FMstation broadcasts a signal with 180-kHz bandwidth when |f(t)|max = 2 V. Find kFM for the modulator if the spectral extent of f (t) is 30 kHz, by using Carson's r

Give an example of one address microprocessor, 8085 is a one address microp...

8085 is a one address microprocessor. In 8085 interrupts are classified by hardware and software interupts.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd