Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Load Balancing and Load Management
It has been observed in which the load on all three phases of a distribution line and between the feeders is not balanced. This output in increased current in the heavily loaded line along with increased line losses. If the loads on each phase or between feeders are redistributed, the losses will be reduced. Shifting of consumers for the overloaded phase should be completed to decrease the imbalance in the system. The best technique to identify unbalancing is to construct current duration curves for all three phases.
In the scenario of overloaded distribution systems, load management plays an extremely significant role for reduction of technical losses. Load management is significant to ensure supply to feeders feeding critical emergency loads, curtailing supply to other loads and shifting of loads among feeders.To avoid overloading of lines and transformers in real time mode, modern features such as distribution automation might be incorporated. Distribution automation along with SCADA (Supervisory Control and Data Acquisition System) is a significant tool for load management that should be introduced.
why we protect dg in islanding condition?
Q. The response v(t) of a linear system to a unit-step excitation i(t) is given by v(t) = (5 - 3e -t + 2e -2t ) u(t). Determine the transfer function H(s) = V (s)/I (s).
Q. What are the Display Devices? Display devices can be categorized as on/off indicators, numeric, alphanumeric, or graphical displays. They may also be classified as active an
Suppose that the length of a 10Base-5 cable is 2500 metres. If the speed of propagation in a thick co-axial cable is 60% of the speed of light, how long does it take for a bit to
Activities to Preparing Long-term Plans 1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to cons
Design two converters - boost-buck (Cuk) and flyback meeting the following criteria: Vin = 15 V ... 35 V Vout = 25 V Output voltage ripple 1% peak to peak Switching frequen
Trap is called as Non-Maskable interrupts, which is used in emergency condition.
ON output plot of a JFET n-channel transistor if ID is close to IDSS does the value of VGS close to VP?
Describe the effect of following parameters. Abrasive grit size. Amplitude and frequency of vibration.
how a combination clipper works?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd