Load Balancing and Load Management

It has been observed in which the load on all three phases of a distribution line and between the feeders is not balanced. This output in increased current in the heavily loaded line along with increased line losses. If the loads on each phase or between feeders are redistributed, the losses will be reduced. Shifting of consumers for the overloaded phase should be completed to decrease the imbalance in the system. The best technique to identify unbalancing is to construct current duration curves for all three phases.

In the scenario of overloaded distribution systems, load management plays an extremely significant role for reduction of technical losses. Load management is significant to ensure supply to feeders feeding critical emergency loads, curtailing supply to other loads and shifting of loads among feeders.To avoid overloading of lines and transformers in real time mode, modern features such as distribution automation might be incorporated. Distribution automation along with SCADA (Supervisory Control and Data Acquisition System) is a significant tool for load management that should be introduced.


Related Discussions:- Load balancing and load management

Compute sending - end voltage current and real power, Q. Athree-phase, 60-H...

Q. Athree-phase, 60-Hz transmission line has a total series impedance of 22.86 62.3°  per phase. It delivers 2.5 MW at 13.8 kV to a load connected to its receiving end. Compute th

Transmission - salient features of nep, Transmission: The policy empha...

Transmission: The policy emphasizes in which adequate and timely investment along within efficient and coordinated operation is essential for developing a robust and integrate

Voice control mobile base, i need help for my final year project, and i wil...

i need help for my final year project, and i will really appreciate if you can assist me as soon as possible

Find the per-unit voltage regulation, Q. A single-phase, 3-kVA, 220:110-V, ...

Q. A single-phase, 3-kVA, 220:110-V, 60-Hz transformer has a high-voltage winding resistance of 0.3 , a low-voltage winding resistance of 0.06 , a leakage reactance of 0.8  on i

What do you mean by negative impedance converter, Q. What do you mean by Ne...

Q. What do you mean by Negative Impedance Converter? The op-amp circuit of Figure causes a negative resistance R in between the input terminal and ground. In the more general

Calculate the rms value, The sinusoidal voltage source in the circuit shown...

The sinusoidal voltage source in the circuit shown in Fig. is developing an rms voltage of 2000 V. The 4 ? load in the circuit is absorbing four times as much average power as the

Opmi]]r., Ask question #Minimukkgkmm 100 words accepted#

Ask question #Minimukkgkmm 100 words accepted#

Methods of testing, Methods of Testing Irrespective of reasons, testin...

Methods of Testing Irrespective of reasons, testing is commonly carried out 1. On site, or 2. In a Meter Testing Station (MTS) accredited as per IS/ISO/IEC 17025.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd