linear programming, Engineering Mathematics

Assignment Help:
A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper respectively. Formulate this as a Linear Programming Problem.

Related Discussions:- linear programming

Test for the existence of regression, (i) Test for the existence of regress...

(i) Test for the existence of regression (the F-test). Carefully de ne the null and alternative hypothesis, and explain the result of any R output you obtain. (ii) Which of the

Two distinct case, A) Prove the following theorem by considering two distin...

A) Prove the following theorem by considering two distinct cases. For any integer n, n 2 + n is even. B)  If x = r 2  - s 2 and y = 2rs for any integers r and s, then x 2 +

Six years time, A young couple requires RM30000 for an overseas trip which ...

A young couple requires RM30000 for an overseas trip which they want to make in six years time. How much they have to invest now at 18% p.a. compound interest compounded monthly, t

Solid mensuration, The two sides of a triangle are 17 cm and 28 cm long, an...

The two sides of a triangle are 17 cm and 28 cm long, and the length of the median drawn to the third side is equal to 19.5 cm. Find the distance from an endpoint of this median to

Pawel, how much for small assigment question ? differentation ?

how much for small assigment question ? differentation ?

Galerkin Mrthod, Solve differential equation of Y" = 0 using the Galerkin m...

Solve differential equation of Y" = 0 using the Galerkin method and considering 0 = x= 3 given that: h = 0cm when x = 0m and h = 10cm when x = 3m.

Accurately measure the fluid level, You are working as an engineer on a pro...

You are working as an engineer on a project that involved being able to accurately measure the fluid level change in a large outdoor holding tank. The fluid level rises and falls a

Find the equilibrium points, Find the equilibrium points (real and imaginar...

Find the equilibrium points (real and imaginary parts, to 3 decimal places) if unit positive line charges are placed at a+ic, b+id, and -3-2i. Designate one of these numbers as "m

Vector, prove that A=3i+j-2k, B=-i+3j+4k ,C=4i-2j-6k and find the length of...

prove that A=3i+j-2k, B=-i+3j+4k ,C=4i-2j-6k and find the length of the triangle

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd