Cohen Chemicals, produces two types of photo-developing fluids. The first, a black and white picture chemical, costs Cohen $2500 per ton to produce. The second, a colour photo chemical, costs $3000 per tonne to produce .
Based on an analysis of current inventory levels and outstanding orders Cohen’s production manager has specified that at least 30 tons of black and white chemical and at least 20 tonnes of color chemical must be produced during the next month. In addition the manager notes that an existing inventory of a highly perishable raw material needed in both chemicals must be used within 30 days. To avoid wasting the expensive raw material Cohen must produce a total of at least 60 tonnes of the photo chemicals in the next month. Formulate as a minimization LP problem. Solve the model

Related Discussions:- Linear Equation

Ques, Ask questb. A Company produces 150 cars. But the production rate vari...

Ask questb. A Company produces 150 cars. But the production rate varies with the distribution. Production Rate 147 148 149 150 151 152 153 Probability 0.05 0.10 0.15 0.20 0.30 0.15

Simplex solution, difference between simplex solution procedure for maximis...

difference between simplex solution procedure for maximisation and minimisation

Assignment, Q2. Six Operators are to be assigned to five jobs with the cost...

Q2. Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assign

Sources of stress and job burnout, QUESTION Discuss the major sources o...

QUESTION Discuss the major sources of stress and job burnout and outline the strategies for managing stress. QUESTION How can you use the „Johari Window Model? as a

Rules regarding the table structure, Rules  Regarding the Table  Structur...

Rules  Regarding the Table  Structure a. Table Number: When a number  of tables  are constructed serial number of the tables  should  be given  to each table. b. Title Th

#title.L.L.p, #use the simple method to solve the following L.P.P. Maximi...

#use the simple method to solve the following L.P.P. Maximize Z =4X1 +10X2 subject to constraints, 2X1 +X2 2X1+5X2 2X1 +3X2 X1,X2 > 0

Assignment problem, a c++ program to implement assignment problem??????????...

a c++ program to implement assignment problem???????????

Lp, #question.Solve the following Linear Programming Problem using Simple m...

#question.Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0.

Properties of normal distribution - probability distribution, Properties of...

Properties of Normal Distribution a.It is a continuous  probability  distribution having  parameters m and . b.The normal  curve is perfectly symmetrical about  the mean (

TRANSPOTATION, LIMITS OF TRANSPOTATION PROBLEM

LIMITS OF TRANSPOTATION PROBLEM

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd