Cohen Chemicals, produces two types of photo-developing fluids. The first, a black and white picture chemical, costs Cohen $2500 per ton to produce. The second, a colour photo chemical, costs $3000 per tonne to produce .
Based on an analysis of current inventory levels and outstanding orders Cohen’s production manager has specified that at least 30 tons of black and white chemical and at least 20 tonnes of color chemical must be produced during the next month. In addition the manager notes that an existing inventory of a highly perishable raw material needed in both chemicals must be used within 30 days. To avoid wasting the expensive raw material Cohen must produce a total of at least 60 tonnes of the photo chemicals in the next month. Formulate as a minimization LP problem. Solve the model

Related Discussions:- Linear Equation

Paired sample sign test - hypothesis testing , Paired sample  sign Test ...

Paired sample  sign Test Paired samples  sign test is applied  to a situation where two sample  are taken from  two population which  have continuous symmetrical distributi

Simulation models - operation research model, These models are used to dev...

These models are used to develop a method to evaluate the merit of alternative courses or action by representing with a mathematical model of the problems where various variab

LPP, A paper mill produces two grades of paper viz., X and Y. Because of r...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Lp model, A company produce three sizes of windows fans small,medium and la...

A company produce three sizes of windows fans small,medium and large. The manager has formulated an LP model for production.

C, classification on the bases of function or purpose

classification on the bases of function or purpose

Objectives of strategic management, Problem What are important objectiv...

Problem What are important objectives of strategic management and the causes for failure t of strategic management Objectives To keep pace with the changing business e

Computer aid for quantitative data analysis, Normal 0 false ...

Normal 0 false false false EN-IN X-NONE X-NONE

Assignment, A paper mill produces two grades of paper viz., X and Y. Becaus...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Integer programming, An integer programming problem is identical to a linea...

An integer programming problem is identical to a linear programming problem except that one or more decision variables are constrained to take integer values. Such problems cannot

LLP Simple method, Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2...

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0 on..

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd