Linear Equation, Operation Research

Assignment Help:
Cohen Chemicals, produces two types of photo-developing fluids. The first, a black and white picture chemical, costs Cohen $2500 per ton to produce. The second, a colour photo chemical, costs $3000 per tonne to produce .
Based on an analysis of current inventory levels and outstanding orders Cohen’s production manager has specified that at least 30 tons of black and white chemical and at least 20 tonnes of color chemical must be produced during the next month. In addition the manager notes that an existing inventory of a highly perishable raw material needed in both chemicals must be used within 30 days. To avoid wasting the expensive raw material Cohen must produce a total of at least 60 tonnes of the photo chemicals in the next month. Formulate as a minimization LP problem. Solve the model

Related Discussions:- Linear Equation

Big M method, Maximize p = (3)x + 2y subject to 2x + y 3x + 4y >= 12

Maximize p = (3)x + 2y subject to 2x + y 3x + 4y >= 12

Methodology of operation research, The systematic methodology developed f...

The systematic methodology developed for an operation research study with problems involving conflicting multiple objective policies and alternatives. Operation research in

Objectives of measuring dispersion - measure of dispersion, Objectives of M...

Objectives of Measuring Dispersion a. To judge the Reliability  of Measures of Central Tendency: Measure of dispersion  is the  only means  to test the  representative charac

Techniques of work measurement, Techniques  of Work  Measurement A n...

Techniques  of Work  Measurement A number of work  measurement  techniques  have been  developed  to suit  different  types of work . There are: 1. Repetitive work: The

Demerits of range - measure of dispersion , Demerits  of Range a.It g...

Demerits  of Range a.It gives  importance  to the  two  extreme  values and is very much affected by the extreme items. b.The range  provides  no information  about the  st

Linear programming problem, Solve the following Linear Programming Problem ...

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Answer, explain operation research with example.and also discuss the scope ...

explain operation research with example.and also discuss the scope of OR in modern management.

Sequential sampling -sampling decisons, Sequential Samplin The previou...

Sequential Samplin The previous  has shown  that the sampling  units  were drawn  prior  to the drawing of the actual   sample  and has  a fixed  size. But the  sequential  sa

Production option and the ato process design, The plant is using the chase ...

The plant is using the chase production option and the ATO process design. The BOM is illustrated below.   Requirement The factory works on a process layout but

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd