Limitations of Group Technology or Cellular Manufacturing

Group Technology is a great concept. But all good concepts do have their own limitations and need proper care in their applications for results to be realized in practice. The limitations of cellular manufacturing may be as follows.

  1. High Cost: The cost of implementation is generally high. This is because an outside consultant is often required since in house expertise on GT is rarely available. It requires a long set up time and painful debugging.
  2. Not Suitable for large Variety of Products : May not be suitable for a factory with a very large variety of products.
  3. The entire production of the company cannot be put under the GT and hence GT will have to coexist with the conventional layouts.
  4. Not suits all Applications : There are too many GT codes in used and there is no one GT code that suits all applications.
  5. It is often difficult to conceive all the operations for a group of components being taken care of in the cell created for it.
  6. The range of product mix in a plant many be under constant change in which case the GT cells may need constant revision which is impractical .

Related Discussions:- Limitations of group technology or cellular manufacturing

Project management structure, what are the segments involved in project man...

what are the segments involved in project management structure?

What if i need more money for my project, Q. What if I need more money? ...

Q. What if I need more money? The similar applies here as in Question 17. Though the options that are open will depend on how far the project has already advanced. In general t

Develop an action plan based on your findings, Question: As a newly app...

Question: As a newly appointed rector of your school, you have received many complaints from students .It is your aim to " democratise quality ", that is to make quality contro

Stakeholde, Differences between Primary and Secondary Stakeholders?

Differences between Primary and Secondary Stakeholders?

Network, charateristics of a good network

charateristics of a good network

Fixed position based layout, Fixed Position Based Layout As the term its...

Fixed Position Based Layout As the term itself implies, fixed layout involves the movement of men and machines to the product which remains stationary. In this type of layout th

Organization design-managerial function of organizing, Organization design ...

Organization design Organization design refers to the overall configuration of positions and interrelationships among positions within the organization. Design therefore mainly

What are the uses of cost benefit analysis, What are the uses of Cost Benef...

What are the uses of Cost Benefit Analysis? Generally, this technique (complex cost benefit analysis) is advocated for use within decisions on public projects, wherein social c

Evaluation of the prototype, At this stage of design the designer will...

At this stage of design the designer will invariably by under tremendous pressure to quickly finish the design and pass it on for production. This is so because even w

Management of change, Problem 1: a) ‘Project Management is closely link...

Problem 1: a) ‘Project Management is closely linked with the management of change' Explain why. b) Elaborate on two models of change. Explain the relevance, applicability

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd