Kicker of reinforced concrete cantilever retaining walls, Civil Engineering

Assignment Help:

Q. Kicker of reinforced concrete cantilever retaining walls located at the position of largest moment and shear force - why?

Generally for reinforced concrete cantilever retaining walls, there is a 75mm kicker at the junction wall stem and base slab to facilitate the fixing of formwork for concreting of wall stems. If a higher kicker (which is more than 75mm height) is provided instead, at the time of concreting of base slab the hydraulic pressure built up at kicker of fresh concrete cause great problem in forming a uniform and level base slab.  

Even though the fact that position of kicker in a cantilever retaining wall is the place of largest shear andflexure, there isn't any option left however to provide the kicker at this position.


Related Discussions:- Kicker of reinforced concrete cantilever retaining walls

Beams, how to convert uniformly varying loads to point loads

how to convert uniformly varying loads to point loads

State the total load which the raft can support, A raft, 8 m × 24 m, is fou...

A raft, 8 m × 24 m, is founded at a depth of 4 m in sand with a value of N = 20 up to great depth. Illustrate the total load which the raft can support? What will be the total c

Track structure on broad gauge, Q. What is the minimum prescribed track str...

Q. What is the minimum prescribed track structure for LWR / CWR on Broad Gauge? Ans.- 1. General - The minimum length of LWR depends upon - i. Range of temporary variati

Settlement due to reduction in volume of soil, Q. Settlement due to Reducti...

Q. Settlement due to Reduction in Volume of Soil? The weight of the structure causes reduction in volume of soil due to expulsion of pore water from the voids. This reduces the

Cargo handling facilities, Cargo Handling Facilities: All water transp...

Cargo Handling Facilities: All water transport terminals require cargo handling facilities. Cranes of various sizes are used. In docks, traveling cranes are popular (Figure).

Surveying, tracing paper method for solving three point problem?

tracing paper method for solving three point problem?

#transportation engineering sessional.., #how the result of DETERMINATION O...

#how the result of DETERMINATION OF THE 10 PERCENT FINES value can be interprited?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd