Key role of drilling fluid in rotary drilling, Civil Engineering

Assignment Help:

Question

What is key role of drilling fluid in rotary drilling in site search?


Answer

Drill fluid in rotating serves two main reasons.

(i) Facilitate rotation of drilling tube during rotary drilling.

(ii) Do something as a cooling agent to cool down heat generated during drilling operation.

Traditionally, water is in general employed as drilling fluid. Yet, it suffers from following problems-

(i) It affects constancy of nearby ground with introduction of water into borehole

(ii) It affects excellence of instance by changing water content of soil samples collected from borehole or drillhole.

 

 


Related Discussions:- Key role of drilling fluid in rotary drilling

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

Static, Determine the moment of inertia with respect to the x axis for the ...

Determine the moment of inertia with respect to the x axis for the shaded area shown (Figure 2) . The dimension is a = 2.00m .

Coagulation, incoming water contains 15 mg/L as a substance

incoming water contains 15 mg/L as a substance

Optimum binder content in bituminous pavement, Q. Optimum binder content in...

Q. Optimum binder content in bituminous pavement? Amount of binder to be added to a bituminous mixture can't be too excessive or too little. Principle of designing the optimum

Structure, what is the cutelment length

what is the cutelment length

Design features of major bridge, Q. Design features of major bridge? Im...

Q. Design features of major bridge? Important design features of major bridge projects should be tested and finalised by hydraulic model studies. Bridge waterway, shape, length

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd