Key functions of changed components of paint, Civil Engineering

Assignment Help:

Question

What are key functions of changed components of paint?


Answer


For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.

Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats.

Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.

Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.

 

 


Related Discussions:- Key functions of changed components of paint

Torpedo splice triple wedges, Torpedo splice triple wedges In a Torpedo...

Torpedo splice triple wedges In a Torpedo splice triple wedges, shown in Figure, are provided to firmly hold tendon wires. Whole assembly of the splice is housed in a sleeve. L

Write short note on pressure filter, Q. Write short notes on Pressure filte...

Q. Write short notes on Pressure filter for drinking water supply. What are pressure filters and what are its advantages / disadvantages over the normal filter bed. What is p

Which are the colloidal impurities in water, Q. Which are the Colloidal Imp...

Q. Which are the Colloidal Impurities in water? The finely divided particles of soil such that their small quantities are not Visible to the naked eye are

Geodesy, what is the difference between geodesy and plane survey

what is the difference between geodesy and plane survey

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Marine pilling, what are the problems in traditional marine pilling system ...

what are the problems in traditional marine pilling system of steel tubular pile with concrete infill

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd