What are key functions of changed components of paint?


Answer


For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.

Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats.

Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.

Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.

 

 


Related Discussions:- Key functions of changed components of paint

Harbour, what is entrance channel in harbour?

what is entrance channel in harbour?

Determine about the pre-stressed concrete beam, Determine about the pre-str...

Determine about the pre-stressed concrete beam A pre-stressed concrete beam has a width of 200 mm and an overall depth of 400 mm. The permissible stresses in tension and compre

Design volume of the aeration basin - sewer construction, Design volume of ...

Design volume of the aeration basin - sewer construction: Problem: What is the design volume of the aeration basin? Solution Assuming that 30% of the plant influe

Vibration in structures – resilient bearings, Q. Vibration in structures - ...

Q. Vibration in structures - resilient bearings? When railway tunnels are built close to buildings, ground-borne vibration is transmitted to buildingsthrough compression and sh

Concrete, types of concrete and its uses

types of concrete and its uses

Mechanics of structure, distinush between determinant and indeterminant pla...

distinush between determinant and indeterminant plane trusses

Example for productivity analysis and improvement, Example for Productivity...

Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day.  The job site

Theory of elasticity and plasticity, derivation for strain energy stored in...

derivation for strain energy stored in a body due to torsion

Determine the loss in post-tensioned members, Determine the Loss in post-te...

Determine the Loss in post-tensioned members This loss occurs only in post-tensioned members. There always exists a certain amount of friction in the jacking and anchoring syst

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd