Key functions of changed components of paint, Civil Engineering

Assignment Help:

Question

What are key functions of changed components of paint?


Answer


For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.

Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats.

Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.

Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.

 

 


Related Discussions:- Key functions of changed components of paint

Define seismic isolation bearings - bridge bearing, Define Seismic Isolati...

Define Seismic Isolation Bearings  - Bridge Bearing? Many bridges had been built before the proper seismic design specifications were known to us. These bridges require strengt

Plumbing technology, This assessment will test Learning Outcomes 3 and 4 as...

This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect

Explain about void ratio drops, A clay layer 25 metres thick has a saturate...

A clay layer 25 metres thick has a saturated unit weight of 19.2 kN/m 2 . Ground water level occurs at a depth of 5 metres. It is proposed to construct a reinforced concrete founda

Types of stone masonary, random rubble coursed, suare rubble coursed and un...

random rubble coursed, suare rubble coursed and uncoursed, polygonal walling, flint walling

Constructed wetland design guidelines, Develop a simple urban constructed w...

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed

Retaining wall, I retained the soil in my yard by brick with 3 levels to a...

I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o

IRC Class AA loading in existing industrial areas, For IRC Class AA loading...

For IRC Class AA loading in existing industrial areas, what is load (kN/m) has to applied base don the wheel loads. especially raft foundation & roads are at same level.

Determine the active thrust on the wall by culmann method, A retaining wall...

A retaining wall with its face inclined at 75° with horizontal is 10 m high and retains soil inclined at a uniform surcharge angle of 10°. If the angle of internal friction of the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd