Key functions of changed components of paint, Civil Engineering

Assignment Help:

Question

What are key functions of changed components of paint?


Answer


For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.

Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats.

Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.

Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.

 

 


Related Discussions:- Key functions of changed components of paint

Theory on the horizontal reactions of portal frames, Determine the horizont...

Determine the horizontal abutment reaction of a rectangular portal frame under increasing central concentrated load

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Seasoning of timber, Seasoning of Timber It is a process by which moist...

Seasoning of Timber It is a process by which moisture content in a freshly cut tree is reduced to a appropriate level. The durability of timber is increased by doing so. The se

Concrete, whats the role of gypsum in concrete?

whats the role of gypsum in concrete?

Concrete structural members tensile stresses, Concrete structural members t...

Concrete structural members tensile stresses In concrete structural members tensile stresses act in a longitudinal direction. This is why, stretched tendons (hereafter, called

Bulking of sand, what is the permissible limit of sand

what is the permissible limit of sand

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Binder, Binder: Normally 60/70 penetration grade, and provides cohesio...

Binder: Normally 60/70 penetration grade, and provides cohesion to the mixture and increases its stability. The mix design is done by the Marshall test, in which a specimen

Define the transmissivity and reynold number, Define the Transmissivity and...

Define the Transmissivity and Reynold Number TRANSMISSIVITY: (T) A measurement of the rate of groundwater movement through different soil and rock materials. For both confined

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd