Question
What are key functions of changed components of paint?
Answer For regular paint application, there are largely three key components of paint, namely primer, undercoat and finishing coat.
Primer- This is first layer of a typical painting system and it is used to occupy corrosion and provide a fine bond for subsequent coats. Undercoat-This module acts as a barrier to corrosion agents and even out misdeed of bonding surface. It also serves to secrete underlying conditions and stop details and colour of area of application to affect designed colour and finishing facts of paint.
Finishing coat- This is final layer of a typical painting system and it protects underlying layers from an effect of difficult weather conditions and to supply designed properties of paint like colour, impermeability, wearing resistance and so on.
Ask question #Minimum 100E. The regulations and specifications that followed for compaction works for earth dam in Oman words accepted#
properties of coarse and fine aggregates
moment
Explain the Underwater inspection procedures - inspection of bridge? Under-water bridge inspection, especially the initial inspection, requires careful planning to ensure that
Projection line is the way, in which the earth is made known on a flat piece of paper.
Q. What is Preset in bridge bearing? 'Preset' is a method to decrease the size of upper plates of sliding bearings in order to save cost. Normal length of an upper bearing plat
Q. Determine Length of guide bunds? Length of a guide bund has to be such that the flow approaching even from behind the guide bund would pass through the bridge with minimum obl
what do you mean by harsh condrete mix or because of what concrete mix becomes harsh?
Borrow Pits Borrow pits are the locations from where the embankment soil is obtained. The following guidelines govern the location of borrow pits : (a) They should be pref
Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd