Ground settlement occurs ahead or behind the jacking face for pipe-jacking?
It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 times of tunnel depth ahead of tunnel face and 80% to 90% of settlement to be finished at a similar distance behind the face. Though in the paper 'Monitoring of ground response associated with pipe jacking works - recent experience in Hong Kong', the author highlighted that based on their experience, development of longitudinal settlement was observed at a distance of 3-4 times of tunnel depth behind the tunnel face and little settlements were reported immediately above the tunnelling face.
Define Collisions - Underwater Inspection of Bridge? Structural damage to underwater portions of a bridge can either be collision related or direct result of a collision. Colli
Question What is key meaning of excellence of bentonite slurry in construction of diaphragm walls? Answer Quality of slurry plays a significant role in quality of di
Air Traffic Control: Importance of Air Traffic Control Air Traffic Control is a system by which routes for flying aircraft are defined, flight rules are framed, and f
Example: Convert the following reduced bearings into whole circle bearings: (i) N 65° E (ii) S 43° 15′ E (iii) S 52° 30′ W (iv)
Bridge Loadings: Loadings of bridges have been standardized by the Roads Congress. The major features of the various load classes are given below : Bridges and culvert
Explain Detention or Retention Ponds Detention/Retention Ponds: Designed to reduce and contain the peak runoff from developed areas (more impervious). Attempt to limit the runo
describe how quality control is maintained in a rolled fill dam
Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding to
Properties of Stones The following properties of the stones should betake into account before choosing them for engineering works: Structure: The structure of the stone ca
can we provide base isolation for high rise buildings ? Can we provide it for diagrid structures? if; yes Up to which no of storeys
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd