Jacking face for pipe-jacking, Civil Engineering

Assignment Help:

Ground settlement occurs ahead or behind the jacking face for pipe-jacking?

It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 times of tunnel depth ahead of tunnel face and 80% to 90% of settlement to be finished at a similar distance behind the face. Though in the paper 'Monitoring of ground response associated with pipe jacking works - recent experience in Hong Kong', the author highlighted that based on their experience, development of longitudinal settlement was observed at a distance of 3-4 times of tunnel depth behind the tunnel face and little settlements were reported immediately above the tunnelling face.


Related Discussions:- Jacking face for pipe-jacking

Surveying, what is meant by geodetic survey

what is meant by geodetic survey

Construct the shear force and bending moment diagrams, A Beam A B 12 meter ...

A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute

Acetylene gas cylinder for gas welding, Q. Acetylene gas cylinder for gas w...

Q. Acetylene gas cylinder for gas welding to be erected in upright position Acetylene gas is normally used for gas welding due to its simplicity in production and transportati

Effect of concrete placing temperature, Effect of concrete placing temperat...

Effect of concrete placing temperature on early thermal movement Rate of hydration of cement paste is related to placing temperature of concrete. Rate of heat production is giv

#surveying & levelling, expressions for calculating corrections for earth c...

expressions for calculating corrections for earth curvature

Pcc, Specific Gravity & Water Absorption of Fine Aggregate

Specific Gravity & Water Absorption of Fine Aggregate

Trigo, A pole which leans 11o from the vertical toward the sun casts a shad...

A pole which leans 11o from the vertical toward the sun casts a shadow 12m long when the angle of elevation of the sun is 40o. Find the length of the pole

Revit , how to use the revit program

how to use the revit program

Define the shock transmission unit, Define the Shock Transmission Unit? ...

Define the Shock Transmission Unit? Ever since engineers have started designing multi span simply supported bridges, they have been dreaming of connecting all the spans togethe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd