Jacking face for pipe-jacking, Civil Engineering

Assignment Help:

Ground settlement occurs ahead or behind the jacking face for pipe-jacking?

It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 times of tunnel depth ahead of tunnel face and 80% to 90% of settlement to be finished at a similar distance behind the face. Though in the paper 'Monitoring of ground response associated with pipe jacking works - recent experience in Hong Kong', the author highlighted that based on their experience, development of longitudinal settlement was observed at a distance of 3-4 times of tunnel depth behind the tunnel face and little settlements were reported immediately above the tunnelling face.


Related Discussions:- Jacking face for pipe-jacking

Emulsion - road materials, Emulsion: An emulsion is a bituminous bind...

Emulsion: An emulsion is a bituminous binder which is in a fluid form at atmospheric temperatures above O o C and requires no heating at all. Bitumen cab be converted to an e

Insurance required to be incorporated in deal, Question Is procurement ...

Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra

Bond performance of bar reinforcement, Question Does occurrence of rust hav...

Question Does occurrence of rust have adverse collision to bond performance of bar reinforcement ? Answer In fact, presence of rust in bars cannot have adverse impact to the bo

Define overloading - deterioration in steel, Define Overloading - Deteriora...

Define Overloading - Deterioration in Steel? Steel structural elements are sensitive to impact damage from moving vessels and other types of accidental overloading. Impact or c

#title., Ask question #Minimum 100 words accepted2812539076# you

Ask question #Minimum 100 words accepted2812539076# you

Explain inspection tools for underwater inspection of bridge, Explain the I...

Explain the Inspection Tools for Underwater Inspection of Bridge? So many Inspection tools are available. The dive team should have access to the suitable tools and equipments

Fillet welding, Strength of member when fillet welded

Strength of member when fillet welded

Determining the amount of pre-camber, 1. Domes - You are a construction man...

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

Major bridge and important bridge, Major bridge - Major bridge is one of wh...

Major bridge - Major bridge is one of which has a total linear waterway of 18 m or more for multiple span and total linear water way of 12 m or more for single span. Important b

Joints in concrete carriageway, Question Is it necessary joints of conc...

Question Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway ? Answer In regular practice, joints are provided in road kerbs to ca

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd