IS CODES FOR BUILDING MATERIALS AND CONSTRUCTION

The following is the list of some of the IS code giving requirements for building materials: IS 269-1989. Specification for ordinary portland cement.

IS 455-1989. Specification for portland slag cement.

IS 516-1959.  Method of tests for strength of concrete.

IS 1123-1975. Method of recognition of natural building stones.

IS 383-1970. Specifications for fine and coarse aggregates.

IS 432-1982. Specification for mild steel.

IS 3495-1976. Gives specifications for building bricks.

IS 287-1973. Gives maximum permissible moisture content in timber for different uses and for different zone.


Related Discussions:- Is codes for building materials and construction

Sampling distribution and approximations of distributions, Sampling Distrib...

Sampling Distribution And Approximations Of Distributions: 1) Learnt three approaches for deriving the probability distributions of functions of one or more random variables v

Projects, GIS AND REMOTE SENSING

GIS AND REMOTE SENSING

Flow, what is maximum flood level

what is maximum flood level

Physical evaluation of food grains, Q. Physical evaluation of food grains? ...

Q. Physical evaluation of food grains? Food grains are judged for quality by their physical, chemical and microbiological examination. The physical examination includes chec

Staircase, The Figure 1 below shows a section through a stairway for a gara...

The Figure 1 below shows a section through a stairway for a garage in a new proposed dwelling. The stairway is 3 meters wide with 300 mm wide treads(7 treads) and 170 mm high riser

What is function of mortar in brick walls, Q. What is Function of mortar in...

Q. What is Function of mortar in brick walls? A distinctive brick wall structure generally comprises the subsequent components:  (i)  Coping on top of the brick wall to prot

Main and key benefits of piers constructed monolithically, What are main a...

What are main and key benefits of piers constructed monolithically with bridge deck over usage of bearings?

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd