Interface between base plates and footings, Civil Engineering

Assignment Help:

Interface between base plates and footings

Surface of footings is generally quite rough so that some levelling has to be carried out for base plates. Interface between base plates and footings after levelling is later filled with grout. At the time of grouting, trapping of air can take place at the underside of base plates and this results in the formation of cavities and uneven contact surfaces on that base plates are rested. Some holes can be drilled in the base plate to avoid occurrence of air trapping.


Related Discussions:- Interface between base plates and footings

Location of construction joints, Q. Location of construction joints? Co...

Q. Location of construction joints? Construction joints are generally required in construction works since there is limited supply of fresh concrete in concrete batching plants

Shape and soundness test - testing of aggregates, Shape and Soundness Test ...

Shape and Soundness Test - Testing of aggregates: Shape For providing a good interlock and strength, the aggregates should be cubical in shape. Elongated and flaky pa

Operation researcg, Discuss Scope and necessity of O.R in industry ?

Discuss Scope and necessity of O.R in industry ?

Explain about vierendeel girder, Q. Explain about Vierendeel girder? Vi...

Q. Explain about Vierendeel girder? Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally u

Key reasons for conducting pull-out tests, Question What are key reason...

Question What are key reasons for conducting pull-out tests for soil nails ? Answer There are largely four bases for this examination- (i) To verify and verify bo

Pressure distribution under rigid and flexible footings, Pressure distribut...

Pressure distribution under rigid and flexible footings For rigid and thick footings, pressure distribution under the footings is generally presumed to be linear. If symmetric

Disparities between regular precast and pipe jacking, Question What are...

Question What are main disparities in design between regular precast concrete pipes and pipes used for pipe jacking ? Answer For pipes used for pipe jacking, they h

Explain the tertiary treatment for wastewater, Explain the Tertiary Treatme...

Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water

Define the influence line-beam shear, Define the Influence line-beam shear?...

Define the Influence line-beam shear?   1.  Replace point of interest with a link element of nominal length.  If the point of interest is a reaction, place a hinge at that poin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd