Installation of Meters and Verification of Connections
Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.
Installation of Meters
a) Position of meter should be such in which reading is simply visible.
b) Mounting of meter should be on solid wall or DP structure or on panel board.
c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.
d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.
e) The meter box should be sealed.
f) The meter recording should be checked at site.
Explain the Working of Asynchronous (Ripple) Counters? An external clock is connected to the clock input of the first flip-flop (FF0) only. Thus FF0 changes state at the falli
Differentiate between dual beam and dual trace oscilloscope
The aim of the research paper is to design a crossover circuit for loudspeaker that will be used with a 2-way speaker. Circuit consists of the resistors, capacitors and operational
emf equation
First section Aim: the aim of this project is to produce a storage scope using a PIC. In this project, several samples were taken from an analog signal and stored in the memo
Global Positioning System: For power utilities, the basic objective of using Global Positioning System (GPS) and GIS should be to: enhance the efficiency of transmissio
how can we increase insulation resistance of sheet
Now that you have the input and output impedances you can design the matching networks. I will require either the Smith Charts showing how you calculated the matching components or
Discuss mode -2 (bi-directional mode) of 8255 (Programmable Peripheral Interface). Only permitted with port A. Bi-directional bus data used for interfacing two computers and GP
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd