Installation of Meters and Verification of Connections
Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.
Installation of Meters
a) Position of meter should be such in which reading is simply visible.
b) Mounting of meter should be on solid wall or DP structure or on panel board.
c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.
d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.
e) The meter box should be sealed.
f) The meter recording should be checked at site.
NAND Gate NAND means NOT AND it complements the output of an AND gate. The symbol of NAND by a NOT gate. Generally Not operation is represented by a bubble as shown
how electromagnetic wave transmitted from the ground are bent back towards the earth when they enter a layer of ionosphere?
working of 4:1 demultiplexer
Power Distribution You will study about the legislative measures that have been taken by our government to address these challenges. In particular, we discuss the Energy Conse
I need help in Simulink model (.mdl) (discrete) for the topic “sensorless control of the pmsm using Back EMF method” with detailed explanation of the estimator (Back EMF method).
Mode 2 In this mode transistor gets turned off by the negative output of PWM current flows through inductance L diode D then divide into two parts one flows through
Why maximum power output is given by a machine at an efficiency of 50 percent?
Q. Explain stages of attending to Rail fracture? Various stages of attending to Rail fracture / weld failure in a L.W.R. track in field - Equipment required - i) Special
Ionic Bonding Instance: NaCl. Na (Z = 11) gives up the outermost shell electron of it to Cl (Z=17) atom, so the crystal is build up of ions with the electronic structure
Q. What is a positive clipper? Explain its action with the help of a circuit. A positive clipper is the circuit which is used to cut off the positive half cycle. The circuit wi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd