Installation of Meters and Verification of Connections
Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.
Installation of Meters
a) Position of meter should be such in which reading is simply visible.
b) Mounting of meter should be on solid wall or DP structure or on panel board.
c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.
d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.
e) The meter box should be sealed.
f) The meter recording should be checked at site.
State about the Embedded Web Technology Embedded Web Technology (EWT) This is a new technology which uses the Internet in real time to interact/control with a device which
why Direct current flow through semiconductors but alternating current cannot flow?
Survey Methods and Analysis - Power Supply There are two major methods of gathering information from customers: qualitative and quantitative. Quantitative Rese
ADI Add Immediate Instruction The bit data specified in the instruction is directly added with contents of accumulator and result of operation is stored in the accum
how harmonics shows effect on power systems?
Q. What is meant by thermal runaway in a transistor ? When current flows through the collector circuit, it produces heat at the collector junction. This increases the temperatu
Q. A 6.6-kV line feeds two loads connected in parallel. Load A draws 100 kW at 0.6 lagging power factor, and load B absorbs 100 kVA at 0.8 lagging power factor. (a) For the comb
how does Combination Clipper works?
Convolution : (i) Express this function in terms of kernel coefficients and convolve with image class.png, (x,y are coordinates of pixels) Io(x,y)=I(x+1,y)-2*I(x,y)+I(x-1,
Suppose that the x rays are emitted from a focal spot isotropically. The photon flux is 3.28 x 10 6 photons mm -2 sec -1 at a distance of 0.75 m from the focal spot. What is the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd