Installation of meters and verification of connections, Electrical Engineering

Assignment Help:

Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.


Related Discussions:- Installation of meters and verification of connections

What is meant by interrupt, What is meant by interrupt? Interrupt is an...

What is meant by interrupt? Interrupt is an external signal that causes a microprocessor to jump to a particular subroutine.

Calculate the impedance, What is the impedance Z between terminals A and B ...

What is the impedance Z between terminals A and B of the networks shown below? Express your answers in polar form. Three voltages represented by v 1 (t)=100cosωt, v 2 (t)=7

Single Phase Induction Motor, How do I connect a Capacitor on the machine i...

How do I connect a Capacitor on the machine if it has a start mechanism

Determine the signal bandwidth and the amplitudes, Determine the signal ban...

Determine the signal bandwidth and the amplitudes, Computer Networking

Compute sending - end voltage current and real power, Q. Athree-phase, 60-H...

Q. Athree-phase, 60-Hz transmission line has a total series impedance of 22.86 62.3°  per phase. It delivers 2.5 MW at 13.8 kV to a load connected to its receiving end. Compute th

Determine current for a bjt, Q. For a BJT with vBE = 0.7V, I CBO = 4 nA, ...

Q. For a BJT with vBE = 0.7V, I CBO = 4 nA, i E = 1 mA, and i C = 0.9 mA, evaluate α, iB,iSE, and β.

Discuss power failure detection circuit interrupt nmi, Draw and discuss pow...

Draw and discuss power failure detection circuit interrupt NMI. The non-maskable interrupt (NMI) is an edge-triggered input which requests can interrupt upon the positive-edge.

What are the signals used in input control signal, What are the signals use...

What are the signals used in input control signal & output control signal? Input control signal STB (Strobe input) IBF (Input buffer full) INTR(Interrupt request) Ou

What do you maen by debugger, What do you maent by Debugger? Debugger:...

What do you maent by Debugger? Debugger: This is a program that allows user to debug and test programs. All computers with microprocessor kits give debugging facility. To not

Variable capacitors, how can I simulate air variable capacitors in cst simu...

how can I simulate air variable capacitors in cst simulator?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd