Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.


Related Discussions:- Installation of meters and verification of connections

Architecture of 8085 microprocessor, Architecture of 8085 Microprocessor ...

Architecture of 8085 Microprocessor The 8085  microprocessor  is an 8 bit  general purpose microprocessor. 8 bit  processor  means it can  read write  and process 8 bit  data

Determine the current in the series circuit, Q. (a) Let a unit impulse of v...

Q. (a) Let a unit impulse of voltage v(t) = δ(t) be applied to a series combination of R = 20 and L = 10 mH. Determine the current i(t)in the series circuit. (b) Repeat (a) for

Compare the percent error of both meters, Q. Error speci?cations on a 10-A ...

Q. Error speci?cations on a 10-A digital ammeter are given as 0.07% of the reading, 0.05% of full scale, 0.005% of the reading per degree Celsius, and 0.002% of full scale per degr

Fourier Series, State by inspection (i.e. without performing any formal ana...

State by inspection (i.e. without performing any formal analysis) all you can about each of the periodic waveforms shown in FIGURE 1 in terms of their Fourier series when analysed

How single stepping can be done in 8086, How single stepping can be done in...

How single stepping can be done in 8086? By setting the Trace Flag (TF) the 8086 goes to single-step mode. In this mode, after the implementation of every instruction s 8086 ge

3rd year electrical/electronics project, I`m a 3rd year electrical engineer...

I`m a 3rd year electrical engineering student studying in Canada, and there is a new course they added in my university for 3rd year students called Engineering Project. from the

Determine the armature current of synchronous generators, Two three-phase, ...

Two three-phase, 6.6-kV, wye-connected synchronous generators, operating in parallel, supply a load of 3000 kWat 0.8 power factor lagging. The synchronous impedance per phase ofmac

Wcdma, what is that mean and explain

what is that mean and explain

Demultiplexer, full sub tractor using demultiplexer

full sub tractor using demultiplexer

Designing 100 line exchange using uni-selector, Q. Designing 100 line excha...

Q. Designing 100 line exchange using Uni-selector? Here three different designing methods for 100 line exchange are discussed: Design: Strowger switching system is designe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd