Inspection and testing of vessels, Mechanical Engineering

Assignment Help:

Q. Inspection and testing of vessels?

The Vendor shall be responsible for all inspection and testing. WorleyParsons reserves the right to inspect vessels or parts of vessels at any time during fabrication to ensure that materials and workmanship are in accordance with the governing Code(s) and this Specification.

All pressure vessels shall be stamped (U1 or U2) in accordance with the requirements of the ASME Code, unless specified otherwise by WorleyParsons.

Vessels manufactured outside of Canada shall be registered with the ‘National Board of Pressure Vessels'.

All vessel materials, including attachments thereto, shall have traceability.

When specified in the Purchase Order, Positive Material Identification (PMI) shall be carried out in compliance with Specification GS902.07.

The Vendor shall provide a detailed Inspection and Test Plan (ITP) for each vessel. The ITP shall include all manufacturing, fabrication and inspection steps and sequences, for review and approval. A typical ‘Jurisdictional Travel Sheet' is not an acceptable substitute, without prior approval.


Related Discussions:- Inspection and testing of vessels

Friction welding, FRICTION WELDING In this, friction is employed to genera...

FRICTION WELDING In this, friction is employed to generate heat b/w two sliding or rotating metal surfaces. This process is usually carried out by placing the pieces to be welded

What is hot extrusion, Q. What is Hot extrusion? Hot extrusion is a hot...

Q. What is Hot extrusion? Hot extrusion is a hot working process, which means it is done above the material's recrystallization temperature to keep the material from work harde

Eccentricity-unbalance-balancing, Eccentricity : This is distance between...

Eccentricity : This is distance between the axis of rotation and CG of mass. Unbalance : This is the product of mass and eccentricity. Balancing : This is

Piping inspection and test plan, Q. Piping Inspection and Test Plan? Pi...

Q. Piping Inspection and Test Plan? Piping Inspection and Test Plan review and Piping Materials Test Results review shall be by the Piping Materials group, or by / with assista

Explain the function phase of radial drilling machine, Function Phase: ...

Function Phase: Steps: 1. To identify the functions. To identify the functions regarding to the problem in radial drilling machine. Our project focus on the create an a

Quantum mechanics, A ball is dropped from a height .If it takes0.200 second...

A ball is dropped from a height .If it takes0.200 second to cross the last 6.00 m before hitting the ground ,find the height  from which it was dropped . Ans) We need to find H

Explain principal process for abrasive jet cutting machines, Explain Princi...

Explain Principal Process for Abrasive Jet Cutting Machines Abrasive particles are fed from the hopper in to the mixing chamber by regulating device as shown in figure.

Polythionic Acid Stress Corrosion Cracking, In Naphtha Hydrotreating Unit, ...

In Naphtha Hydrotreating Unit, does feed/effluent heat exchangers require passivation to avoid polythionic acid stress corrosion cracking.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd