Q. Inspection and Quality Control Certificate :

A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.

The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:

1. Name of manufacturer

2. Date of manufacture

3. Grade of elastomer

4. Bearing dimensions

5. Production Batch No.

6. Accpetance lot No.

7. Date of testing

8. Specific bridge location

9. Explanation of markings on the bearing, if any.


Related Discussions:- Inspection and quality control certificate

Mechanics of solids assignment, What will be the cost of Mechanics of solid...

What will be the cost of Mechanics of solids assignment consisting of 150 questions of 6 marks

Show the result of vulcanization, Q. Show the result of vulcanization? ...

Q. Show the result of vulcanization? As a result of vulcanization, rubber molecules are cross-linked with sulphur. This cross-linking makes the rubber stronger. It allows the r

Define hydraulic grade line (hgl), Define Hydraulic Grade Line (HGL) Gr...

Define Hydraulic Grade Line (HGL) Graph of the sum of the pressure and potential energies at a position along a pipe or open channel. The difference between the EGL and the HGL

Concrete, if the slump of concrete drops how to rectify

if the slump of concrete drops how to rectify

Survey, underground installations

underground installations

Seive analysis, what is sieve analysis? expalin its procedure.

what is sieve analysis? expalin its procedure.

Explain the watersheds - hydrology, Explain the Watersheds - Hydrology ...

Explain the Watersheds - Hydrology The surface area on which runoff generated will flow to a common stream or body of water by gravity. Often separated by higher elevations/top

What is diamond crossing, Q. What is Diamond Crossing? Diamond Crossing...

Q. What is Diamond Crossing? Diamond Crossing is provided when two tracks cross each other either of the same gauge or of different gauges. It consists of two acute crossing (

Concrete carriageway comparatively, Question Why is slump specified in ...

Question Why is slump specified in concrete carriageway comparatively low like 30mmwhen compared with normal concrete like 75mm? Answer Slump of concrete carriageway

Designing sewer pipes, Question While designing sewer pipes , why vitrifie...

Question While designing sewer pipes , why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd