Q. Inspection and Quality Control Certificate :

A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certified. In case of any defect in the bearing, the whole 'lot' shall be rejected by the inspector and certified accordingly.

The bearings shall be transported to the bridge site after final acceptance and should be accompanied by an authenticated copy of the test certificate. An information card giving the following details should be appended to the test cerftificate:

1. Name of manufacturer

2. Date of manufacture

3. Grade of elastomer

4. Bearing dimensions

5. Production Batch No.

6. Accpetance lot No.

7. Date of testing

8. Specific bridge location

9. Explanation of markings on the bearing, if any.


Related Discussions:- Inspection and quality control certificate

Relief features, characteristics of ridge characteristics of escarpment cha...

characteristics of ridge characteristics of escarpment characteristics of plateau characteristics of knoll characteristics of conical hill

Define categories of spalls -underwater inspection of bridge, Define catego...

Define categories of Spalls -underwater inspection of bridge? Spalls are classified as follows:  i. Small spalls - up to 25 mm deep or approximately 150 mm in diameter. i

CBR of soil, Why IRC 37-2012 has taken 90th percentile for pavement design ...

Why IRC 37-2012 has taken 90th percentile for pavement design of expressway or NH while they hav taken 80th percentile for state highway design ????????

Show the stresses during pile driving, Q. Show the Stresses during pile dri...

Q. Show the Stresses during pile driving? Stresses during pile driving In pile driving operation, proper selection of piling hammers is necessary to prevent the damage of

What is moisture-dry density, Describe why soils are compacted in the field...

Describe why soils are compacted in the field. How is the degree of compaction ensured in the field (i.e., control of field compaction)? Distinguish among 'compaction' and 'consoli

Define surface water treatment rule (swtr), Define Surface Water Treatment ...

Define Surface Water Treatment Rule (SWTR) SWTR sets forth primary drinking water regulations requiring treatment of surface water supplies or groundwater supplies under the di

Rolling - binder, Rolling - Binder: The layer thickness is 40-50 mm. R...

Rolling - Binder: The layer thickness is 40-50 mm. Rolling is done in three stages : Initial Rolling By 80-100 kN smooth wheeled roller. Intermediate Rolling B

Surveying, How to read verniers and main scale readings on theodolite of 10...

How to read verniers and main scale readings on theodolite of 10"?

Ghgh, Ask quhestion #Minimum 100 words accepted#

Ask quhestion #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd