State Initial graphics exchange specifications, Mechanical Engineering

Assignment Help:

Initial Graphics Exchange Specifications (IGES)

The basic concept of IGES is concerned with the exchange of product description data from one CAD system to another one. The CAD/CAM integration information network (CIIN) of Boeing served as the preliminary basics of IGES. This exchange takes place via a neutral data format (Figure 7.9). If information has to be transferred from one type of CAD system to another it is converted via a pre-processor to the neutral data format specified by IGES and then converted via a post-processor to the proper data format of the other CAD system. With this concept, it is possible to transfer CAD data between any set of CAD systems, as long they are equipped with the corresponding pre- and post-processors

 

2258_mechanical.png


Related Discussions:- State Initial graphics exchange specifications

Calculation of seismic response loads, Q. Calculation of seismic response l...

Q. Calculation of seismic response loads? The seismic design requirements and the specification of criteria variables for the calculation of seismic response loads for the desi

Design of a filament winding machine, How can I achieve a back and forth mo...

How can I achieve a back and forth movement of carriage system. How can I reverse the motor to go back and forth.

Determine the permissible shear stress, A helical compression spring is use...

A helical compression spring is used to take the shock. The initial compression of the spring is 30 mm and it is further compressed by 50 mm while absorbing the shock. The spring i

Illustrate strip rolling, a) In strip rolling what is i) Forward slip ii) N...

a) In strip rolling what is i) Forward slip ii) Neutral point. Illustrate with diagram. b) State the conditions for rolling.

Purpose of internal review, Q. Purpose of Internal review? The Project ...

Q. Purpose of Internal review? The Project Engineer in consultation with affected disciplines decides the timing of an internal review of IFR issue drawings. Each involved dis

Corrosion - erosion allowance, Q. Corrosion - Erosion Allowance? The re...

Q. Corrosion - Erosion Allowance? The required design life shall be based on written agreement between the user and the Engineering Contractor. Allowance specified shall be ba

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd