Infrastructure railway design, Civil Engineering

Assignment Help:

The objective of this module is:-

- For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibility study for a proposed line speed increase between London and Derby

This will require:

-  A working knowledge of the track design handbook including construction standards, design mathematics and clearances,

-  Discussion with senior railway engineering staff involved with track design, track renewal production, enhancement works and maintenance activities (including track geometry)

-  Understanding of curving rules, track forces, their implications and requirement for good track quality

Background

A section of the Midland Main Line runs from London St Pancras to Derby some 128 miles in length. This is predominately two track with a four track section between Bedford and London

Both passenger and freight trains run over the route currently with maximum speeds of 110mph for passenger and 75mph for freight. The feasibility study is to examine if 125 mph running is possible using conventional or tilting trains

Current Passenger trains are predominately 'Meridian' or HST (High speed Trains) both of which have differing acceleration and braking profiles

The line has many sections of straight and curved track and also passes over several hill sections. There are several major stations on the route (e.g. Derby, Leicester, Kettering, Bedford etc) that were built in the Victorian era and are situated on sharp curves

Throughout the route there are a number of structures including viaducts, overbridges and underbridges. Many of these exist from when the line was constructed and have tight clearances

The track runs over various geological situations from chalk in areas at the south end to granite at the northern end of this section.

South of Bedford the line is 4 track and has an overhead electrification system.


Related Discussions:- Infrastructure railway design

Turbines, How do we get electricity even when the gates of a dam were close...

How do we get electricity even when the gates of a dam were closed?

Structural analysis & design, This is an optional team assignment. This gra...

This is an optional team assignment. This grade will replace your lowest two homework grades. You may work in teams of 3-4 students. Design the lightest concrete cantilever beam

Insurance required to be incorporated in deal, Question Is procurement ...

Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra

Non destructive inspection steel/cast iron substructure, Explain the Non De...

Explain the Non Destructive Inspection Steel/Cast Iron Substructures Some of the structural defects in steel structures may not be visible during visual inspection. In that eve

Define the ignitability - hazardous waste, Define the Ignitability - Hazard...

Define the Ignitability - Hazardous Waste - is a liquid with flash point - Not a liquid and capable of spontaneous and sustained combustion under normal conditions - Ign

What is a projection line, Projection line is the way, in which the earth i...

Projection line is the way, in which the earth is made known on a flat piece of paper.

Machanics, differentiate between moment & couple

differentiate between moment & couple

Explain the system curves - pumping system, Explain the System Curves - Pum...

Explain the System Curves - Pumping System Non-linear plot beginning on the y-axis at the Total Static Head (TSH) and plotted primarily based on the h f .

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd