Importance of racking load for a pre-stressed concrete beam
Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.
In some structures it may be essential that the flexural members should remain crack free even when overloaded. This may be required especially in severely corrosive environments. For such cases it shall be important to calculate cracking load for such members.
Some code requirements stipulate that the minimum ultimate moment, a section is capable of developing, must be atleast 1.2 times the cracking moment, based upon some specified value of modulus of rupture. This is to guard against failure at cracking load.
A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distribute
methods of damp proofing
Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled
Q. False set in pile driving? For pile driving in certain soils such as dense silt and weathered rock, occurrence of false set phenomenon isn't uncommon. During the driving pro
Minimisation of Differential Settlement You are aware that differential settlement causes more distress to the structure, when compared with that of total settlement. The var
hi contactme 9902142308
dowel or aggregate interlock ?how to decide?
Shear lag in typical box-girder bridge For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flang
#question.Techniques of Operations Research - Transportation Problem, Transportation Models Transportation Problems Transportation plays an important role in our econ
The regulations and specifications that followed for compaction works for earth dam in Oman
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd