Importance of geotextiles and sand in reclamation works, Civil Engineering

Assignment Help:

Question

What is main importance of geotextiles and sand in reclamation works?


Answer

For geotextiles used in recovery, they serve mainly subsequent two purposes-

(i) They divide reclamation fill from marine mud;

(ii) They might act as reinforcement to get better constancy of reclamation. Though, reinforcement function is still below heated debate because its presentation as reinforcement depends on some factors like directional strength of woven geotextiles and damage result by installation of vertical band drains.

For sand-
(i) It spreads load of future public dump on top of it;

(ii) It proceeds as drainage path for indulgence of excess pore water pressure for band drain installation.

 


Related Discussions:- Importance of geotextiles and sand in reclamation works

Surveying, what are obstacles in chaining

what are obstacles in chaining

Main purpose of conducting load test for piling works, Question What is...

Question What is main purpose of conducting load test for piling works ? Answer Pile load test gives information on ultimate bearing ability but not settlement be

Simple bending, In case of simple bending after simply supported beam, deri...

In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.

Project costing for Engineering success, Hi I am looking for someone who ca...

Hi I am looking for someone who can help to solve my assignment questions in a subject called project costing and I need him to continue with me until I complete this subject. I a

Explain transpiration and infiltration, Explain Transpiration and Infiltrat...

Explain Transpiration and Infiltration Transpiration: The part of evaporation in which water vapor enters the atmosphere through the plants. The "transpired" water originated

Key functions of changed components of paint, Question What are key fun...

Question What are key functions of changed components of paint? Answer For regular paint application, there are largely three key components of paint, namely primer, u

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd