Illustrate the term - failure due to rupture of steel, Civil Engineering

Assignment Help:

Failure Due to Rupture of Steel

This mode of  failure is likely in lightly reinforced concrete members in which the ultimate strength of  steel is attained before the concrete reaches the ultimate condition. For example, in concrete flexural members with large compression flanges and with low amount of  steel, this type of  failure may  take place.

 


Related Discussions:- Illustrate the term - failure due to rupture of steel

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Dielectric materials are what kind of materials, Dielectric materials are w...

Dielectric materials are what kind of materials ? Answer: It is  insulating materials.

Importance of tendons in post-tensioned members, Importance of Tendons in p...

Importance of Tendons in post-tensioned members Tendons in post-tensioned members are subjected to different amounts of stresses (among themselves) due to following reasons.

Spacing of manholes in straight sections, Question Spacing of manhole...

Question Spacing of manholes in straight sections for diverse pipe sizes is stated in Storm water Drainage Manual. How are figures arrived on? Answer For pipe size

Solid mensuration, the two sides of a triangle are 17cm and 28 cm long, and...

the two sides of a triangle are 17cm and 28 cm long, and the length of the median drawn to the third side is equal to 19.5. find the distance from an endpoint of this median to the

Bond performance of bar reinforcement, Question Does occurrence of rust hav...

Question Does occurrence of rust have adverse collision to bond performance of bar reinforcement ? Answer In fact, presence of rust in bars cannot have adverse impact to the bo

What are service reservoirs, Q. What are Service reservoirs? Service re...

Q. What are Service reservoirs? Service reservoirs, other than normal reservoirs are provided due to the subsequent reasons:  (i)  In case of breakdown of pumping stations a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd