Q. Illustrate the Purpose of pedestals?

When structural steel works are connected to foundation, pedestals are generally designed to carry loads from metal columns through ground surface to the footings that are located below the ground surface. With the installation of pedestals, it's the pedestals, in place of metals, that come into contact with soils. Purpose of the provision of pedestals is to evade the direct contact of metal columns with soils that can cause possible metal corrosion by soils. Soils around the pedestals must be properly compacted to provide sufficient lateral resistance to prevent buckling of pedestals.

1074_Illustrate the Purpose of pedestals.png

Fig: Pedestal


Related Discussions:- Illustrate the purpose of pedestals

Normal approximation to compute the probability, Normal approximation to co...

Normal approximation to compute the probability: A lot contains 100 articles of which 10 are defective. The lot is rejected if a random sample of 10 articles drawn from the lo

Spalling reinforcement for pre stressing works, Spalling reinforcement for ...

Spalling reinforcement for pre stressing works in anchor blocks Reinforcement of anchor blocks in prestressing works usuallycomprises equilibrium reinforcement, bursting reinfo

What are the various impurities in water, Q. What are the various impuritie...

Q. What are the various impurities in water? Ans.- Impurities in water - The impurities in water are classified as - i. Suspended Impurities. ii. Colloidal Impuritie

Shear stress, Shear stress distribution in circular section

Shear stress distribution in circular section

State the process to calculate the transmission length, State the process t...

State the process to calculate the Transmission Length It is the distance required at the end of a concrete member for developing the maximum tendon stress by bond.

Rebound hammer.., rebound hammer working mechanism with detailed specificat...

rebound hammer working mechanism with detailed specifications of the images

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd