Q. Illustrate the process of insulation on pipe?
Factory fabricated sectional pipe insulation shall be applied in staggered joint construction and secured with wire loops or bands on 225 mm centers. On multiple layer construction, all joints shall be lapped one-half of each section between layers. Each layer shall be secured separately. All joints shall be securely butted and all cracks, joints, etc., shall be filled with insulating cement or glass fibre as appropriate.
Mastic sealer shall be used around pipe supports where the insulation is punctured by the support.
Heat traced lines shall be insulated so as to completely cover both line and tracing.
Insulation shall be covered with metal jacketing lapped a minimum of 50 mm on all seams and secured with screws and bands, locating one band at each lap joint and spaced a maximum 450 mm on center. Vertical jacketing shall be secured with "S.' clips.
What is the limition of kkleins constraction?
Creating a new style To create a new dimension style, make sure the STANDARD style is the current style, click in the Name edit box then type the name of the new style you want
Steam turbine comprises of stages, number and size of the stages depends upon the break horsepower of the turbine. The stage has set of moving and fixed blades. The moving blade
Maintenance Operations: The maintenance operations cover various activities such as: (a) making good rain cuts in embankment, (b) clearing the side ditches of vegetatio
what are the complications of a binary vapour cycle?
#question.want settle down where sheet metal engineers are required.
Mash stitch welding An overlap of about 1.15 mm is kept and then the plates are squeezed flash by application of pressure at hot condition. Mash stitch welding is used in the
Continuous Furnace: Parts to be treated are situated on several sort of conveyor that move into the furnaces as per to programmed heating cooling cycle. The time for unloadin
a) Round off the numbers 865250 amd 37.46235 to four significant figures and compute Ea, Er, Ep in each case. b) IF u= 4 x 2 y 3 /z 4 and errors in x, y, z be 0.001, determine
Three basic types for microbial systems: Porous, nozzle and orifice Porous sparger Laboratory operation, usually constructed from sintered glass or metal. Disadvantages a
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd