Q. Illustrate the Design discharge for foundation?
To provide for an adequate margin of safety, the foundation and protective works of a bridge should be designed for a flood discharge of higher magnitude than the waterway design discharge. For this purpose, the waterway design discharge may be increased by the percentages given in Table.
Table: Foundation Design Discharge with Percentage Addition to Waterway Design Discharge
how many rcc is use for 1 brass?
Question While designing water storage tank , has movement joints be installed? Answer While designing water storage tanks , group joints can be set up in similar w
State the method of Pre- Tensioning It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concr
Q. Local vehicle parapet strong enough to contain vehicles? Majority of local parapets are 1.1m high in addition they are designed to resist impact from a 1.5ton car moving at
Chemical Classification On the basis of their chemical composition engineers prefer to classify rocks as: 1. Silicious rocks 2. Argillaceous rocks 3. Calcare
design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.
Write a Survey Paper: Write between 7 to 10 pages a survey paper in one of the following topic : ( The Future of HCI. ) For the paper the font size should be 12 points
Differentiate between concrete and tendons In the case of pre-tensioned concrete members, the transfer of prestress takes place due to the bond between concrete and tendons. In
how to survey the plot cross section
Question Have to emulsified asphalts or cutback asphalts be selected as staple coat in bituminous road works? Answer Emulsified asphalt is a postponement of asphalt
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd