Hydraulics, Civil Engineering

Assignment Help:
A tank with vertical sides contain 3m of water in the bottom, overlain by 4m of oil with no intermixing. Draw pressure diagram due to the oil and water on one of the tank sides and use it to find the size and position of the resultant force

Related Discussions:- Hydraulics

Determine the cubic yard in the ground, An earthwork contractor encountered...

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor

Mini projects, is there any innovative projects in disaster management ?

is there any innovative projects in disaster management ?

Properties of bricks, Properties of Bricks The required properties of g...

Properties of Bricks The required properties of good bricks are following: A.   Color: Color should be bright and uniform. B.   Shape: Bricks should have plane faces.

Sulphate-resisting cement not used in marine concrete, Question Explain...

Question Explain the reason why is sulphate-resisting cement not used in marine concrete ? Answer Major components of Portland cement are tricalcium silicate, dicalciu

Explain the soil texture and soil structure, (a) Explain the 'Soil Texture'...

(a) Explain the 'Soil Texture' and 'Soil structure'. What are the various terms used to explain the above properties of the soil? (b) A clay sample having natural moisture conte

Key meaning of excellence of bentonite slurry, Question What is key me...

Question What is key meaning of excellence of bentonite slurry in construction of diaphragm walls? Answer Quality of slurry plays a significant role in quality of di

N-type semiconductor is an example of what semiconductor, N-type semiconduc...

N-type semiconductor is an example of what semiconductor? Answer : N-type semiconductor is an example of extrinsic semiconductor.

Define sample collection - clean water act, Define Sample Collection - Clea...

Define Sample Collection - Clean Water Act? The collection of the sample is able to have significant effects on the complete analytical process. Additionally, to make sure some

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Methods of contouring by grid points, the elevations of grid points for an ...

the elevations of grid points for an area as follows: 1 2 3 4 5 6 7 8 F 690 709 726 732 735 740 743 747 E 696 715 729 736 740 737 739 740 D 702 723 733 742 737 737 745 747 C 707 72

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd