How to determine the frequency of flood, Civil Engineering

Assignment Help:

Q. How to determine the frequency of flood?

Flood frequency may be estimated preferably from flood records, if available, for a number of years or they may be based on rainfall records.

Where records are available for a period more than 50 years, the design flood for 50 year frequency should be determined using statistical method.

Where records are available extending over a period near about 50 years, the design flood should be the 50 years flood determined from the probability curve prepared on the basis of recorded flood during the period.

 


Related Discussions:- How to determine the frequency of flood

Total station, describe in detail the various parts of a total station

describe in detail the various parts of a total station

How to evaluate quality of bricks, Q. How to evaluate quality of Bricks? ...

Q. How to evaluate quality of Bricks? 1. Clour -Deep red, Carry red, Copper red, colour is indication of uniform burning and also suggests quality of clay used. Over brunt bric

What to do to improve the reliability of the test results, Explain clearly ...

Explain clearly with a neat sketch how you will verify the coefficient of permeability of a clay sample in the laboratory and derive the expression used to compute the permeability

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Define the categories of corrosion of steel structures, Define the Categori...

Define the Categories of Corrosion of steel structures? Corrosion of steel structures can be classified as under: -   Atmospheric corrosion -   Underwater corrosion -

Pre-stressing work, Under which situation shall engineers use jacking in ag...

Under which situation shall engineers use jacking in agreement end only and from both ends in pre-stressing work?

Masonry, Sketches for English bond, Stretcher bond, Header bond, Flemish bo...

Sketches for English bond, Stretcher bond, Header bond, Flemish bond in first & second layer plan, elevation and 3 dimensional view of brick bond.

Surveying, describe two fundamentals purposes of surveying.

describe two fundamentals purposes of surveying.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd