How to construct a reinforced concrete foundation, Civil Engineering

Assignment Help:

A clay layer 24 metres thick has a saturated unit weight of 18 kN/m3. Ground water level occurs at a depth of 4 metres. It is proposed to construct a reinforced concrete foundation, length 48 m and width 12 m, on the top of the layer, transmitting a uniform pressure of 180 kN/m2. Determine the settlement under its centre.  E for the clay is 33 MN/m2 obtained from triaxial tests. Initial void ratio = 0.69. Change in void ratio = 0.02.

 


Related Discussions:- How to construct a reinforced concrete foundation

Explain the influence line-moment, Influence line-moment 1.  Replace th...

Influence line-moment 1.  Replace the point of interest with an imaginary hinge. 2.  Rotate the beam one unit rotation by apply equal but opposite moments to each of the two

Find the length of the chord, Q If the degree of curve is defined by the a...

Q If the degree of curve is defined by the angle at the center subtended by an arc (or chord) 20 meters, find the length of the chord in meters so that the versine measured in cm

Supply each tremie pipe with a single concrete truck, Question Througho...

Question Throughout concreting of diaphragm walls , three tremie pipes are used in single time. But, only one concrete truck is obtainable. How have to concreting works been a

Define pressure on an inclined plane, Define Pressure on an Inclined Plane ...

Define Pressure on an Inclined Plane Similar to a vertical plane, fluid pressure increases linearly with increasing depth. The average pressure on an inclined plane occurs at t

Solid mensuration, a street light is 15 ft directly above the curb. a 6 ft ...

a street light is 15 ft directly above the curb. a 6 ft man starts 10 ft down the street from the light and walks directly across the street which is 10 ft wide. when he reaches th

For the plane area shown determine the first moments, for the plane area sh...

for the plane area shown determine the first moments with respects to the x & y axis & the location of the centroid

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Structural connection loosening - deterioration in steel, Define Structural...

Define Structural connection loosening - Deterioration in Steel? Structural connections joined together by rivets or bolts have a tendency to work loose over an extended period

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd