How to calculate the vertical stress, Civil Engineering

Assignment Help:

A rectangular foundation, 2 m × 4 m, transmits a uniform pressure of 450 kN/m2 to the underlying soil. Verify the vertical stress at a depth of 1 metre below the foundation at a point within the loaded area, 1 metre away from a short edge and 0.5 metre away from a long edge. Use Boussinesq's theory.

 


Related Discussions:- How to calculate the vertical stress

Explain procedure of remote sensing in satellites, Q. Explain procedure of ...

Q. Explain procedure of remote sensing in Satellites? Satellites used for remote sensing are of two types, viz, geostationary and polar orbiting. Geostationary stationary satel

Traffic surveys, Traffic Surveys: The following traffic surveys are n...

Traffic Surveys: The following traffic surveys are needed for preparing a good road project: Classified Volume Counts This survey is normally carried out for 7 days,

Show the application of concrete crash barriers, Q. Show the application of...

Q. Show the application of Concrete crash barriers? Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexibl

Device of cavitations in pipes and drains, Question What is device of cavit...

Question What is device of cavitations in pipes and drains ? Answer Cavitations refer to arrangement of air foam in fluid in low-pressure condition that is lower than satura

Engineering survey, With respect to implementation of Civil Engineering pro...

With respect to implementation of Civil Engineering projects explain the relevance of application of the principle of ''Working from Whole to Part''

Levelling, difference between fly levelling and differential levelling

difference between fly levelling and differential levelling

Show the functions of sleepers in railway, Q. Show the Functions of sleeper...

Q. Show the Functions of sleepers in railway? Functions of sleepers in railway works are as below:  (i)  The primary function of a sleeper is to grip the rail to gauge and t

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Cleaning and greasing of rocker, Cleaning and greasing of Rocker & Roller b...

Cleaning and greasing of Rocker & Roller bearings of open web through girders : In case of standard open web through girders, no separate jacking arrangement is required as the en

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd