How the water table may rise to the ground surface, Civil Engineering

Assignment Help:

State the size of a square footing at the ground level to transmit a load of 900 kN in sand weighing 18 kN/m3 and having an angle of shearing resistance of 36° (N  = 46, Nq = 43). Factor of safety is 3. What will be the changes in the result, if the footing may be placed at a depth of 1 m below ground surface? Suppose, in this case, the water table may rise to the ground surface.

 


Related Discussions:- How the water table may rise to the ground surface

Gas welding be erected in upright position, Question Explain some reaso...

Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel

Defaults for precast concrete pipes made by spinning, Q. Defaults for preca...

Q. Defaults for precast concrete pipes made by spinning? Small diameter precast concrete pipes are generally manufactured by spinning method. The spinning method fundamentally

Analyse and evaluate lightning strikes, Carry out research to Analyse and E...

Carry out research to Analyse and Evaluate: a.   The potential problems that lightning strikes to an aircraft in flight could create. b.   How design features and maintenance

Estimation of loading carrying capacity, Question While designing mini...

Question While designing mini-piles , should strength of grout be disused during estimation of loading carrying capacity? Answer While designing min-piles, there will

Work, Grouted or Penetration Macadam:

Grouted or Penetration Macadam:

IRC class 70R, What will be the structural weight per meter for IRC class 7...

What will be the structural weight per meter for IRC class 70r bridge

Review of available records - underwater inspection, Review of available Re...

Review of available Records - Preparation for Underwater Inspection? Before taking up the underwater inspection, a detailed review of drawings and past report should be carried

Concrete , advantage and disadvantage of concrete

advantage and disadvantage of concrete

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd